Colorado Distribution Feeder Outlets & Switch Replacement This project is to redesign the feeder duct bank out of the 12kV substation and replaces aging electric cables and switches.
Corte Madera Reservoir Replacement The Corte Madera Reservoir Replacement Project will replace the existing Corte Madera reservoir with a new, same capacity, above-ground, concrete reservoir at the same location.
Cross Bore Verification Program Phase III FY21-FY22 The Phase III Cross Bore Verification, Inspection and Assessment Program FY 2021 and FY 2022 is a 2-year project that will video-inspect and assess approximately 1,480 sewer laterals throughout the City.
East Meadow Circles 4/12kV Conversion This project will convert the primary electric distribution system in the East Charleston/Alma Street/East Meadow Drive/Middlefield Road area from 4kV to 12kV.
Gas Main Replacement 23 The Project targets replacement of gas mains and gas services that are nearing their operational life expectancy and have become brittle over time.
Gas Meter Protection Program The Utilities Gas Meter Protection Program is a 3-year program that will install bollards at various locations throughout the City. As part of the citywide gas safety program and in compliance with the Code of Federal Regulation, CFR 49 Part 192.353.
Underground District 26 This project will rebuild and replace deteriorated electrical cables, transformers, switches, and enclosures in the underground electric system in Underground District 26.
Underground District 46 Project The Underground District 46 project will convert electric, telephone, and cable TV , and customer service cables, from overhead to underground. Part of the project includes the re-build of the existing 60kV lines within the project boundary.