Embarcadero Road/El Camino Real Corridor and Intersection Improvements Project

Embarcadero Road Improvements project

Project Description

The Embarcadero Road Improvements project includes preparation of final design plans, environmental documentation, construction documents and required permitting from Caltrans for intersection improvements on El Camino Real at Galvez Street/Embarcadero Road and on Embarcadero Rd, from El Camino Real to Emerson Street. Improvements include, but are not limited to, traffic signal modifications, protected intersection on El Camino Real, sidewalk realignment and widening, high visibility crosswalks, pedestrian scale lighting, bicycle treatments, landscaping, signing & striping, and traffic calming elements. 

On September 19, 2016 Council recommended Alternative 1 for preparation of final design plans. Final design and environmental work is scheduled to be completed by the end of 2017 and construction is tentatively scheduled to begin in the Summer of 2018 pending Caltrans approval.


Project Manager

Shahla Yazdy
Shahla.Yazdy@CityofPaloAlto.org
650-617-3151


Upcoming Meetings & Events

  • Construction Begins: Summer 2018 (Tentative) 