Stanford Shopping Center / Medical Center Projects

Stanford Shopping Center
The Stanford Shopping Center comprises the area located between Sand Hill Road, El Camino Real, Quarry Road and Vineyard Lane. The site includes a total of 70 acres, with 54 acres in the main shopping center area and an additional 15.88 acres in the area between Arboretum Road and Vineyard Lane. The area is zoned Community Commercial (CC). The Simon Group is proposing to expand Stanford Shopping Center with approximately 240,000 square feet of retail expansion space distributed throughout the site. The current shopping center contains approximately 1.4 million square feet of retail stores. The project includes

       
new pad buildings along the front of the SSC towards El Camino Real, in the area east of Bloomingdales, and in the area currently occupied by an older parking deck at the corner of Shopping Center Way and Arboretum Road.

Simon also proposes a 120-room hotel with conference and meeting room facilities focused primarily on serving Stanford University, the Stanford Medical Center, and the Stanford Shopping Center. The location of the hotel has not yet been determined but is proposed to be located either at the corner of Quarry Road and Arboretum Road or at the corner of Quarry Road and Pear Lane. Two new levels of parking are also proposed on top of the newly constructed parking garage on the east side of the SSC.

Stanford University Medical Center Site
The Stanford Medical Center comprises the general area between Sand Hill Road, Vineyard Lane, Quarry Road, Pasture Drive, and including Welch Road and Blake Wilbur Drive. The area is Zoned Medical Office and Medical Research (MOR) and Public Facilities (PF). Stanford University is proposing the demolition of the existing Main Stanford Hospital at 300 Pasteur Drive and construction of a new hospital building, renovating and expanding the Lucile Packard Children’s Hospital and reconstruction of the medical school facilities. The reconstruction of the Hospital is to be in compliance with SB 1953 to meet seismic safety standards. The renovation and expansion project, which would be constructed over a 20-year time line, would result in a net increase of approximately 1.3 million square feet of floor area, including 200,000 square feet of new medical office space at the Hoover Pavilion. The project would also include the demolition and reconstruction of the existing School of Medicine buildings, parking facilities and two buildings now housing medical office space for clinics and community health practitioners. Some of the land for this part of the project is located outside of the City of Palo Alto and may be considered for annexation into the City limits. Contact Information Steven Turner, City of Palo Alto - 650-329-2155

Stanford Project Meetings
Upcoming meetings and public workshops for Stanford Shopping Center / Stanford Medical Center project information
( visit the project home page )
[more]

Stanford Project Information
Stanford Shopping Center / Stanford Medical Center project information
( visit the project home page )
[more]

Stanford Shopping Center/Medical Building Project
Stanford Executive Summary
Stanford Executive Summary for Nov.14, 2007 PTC Meeting
Revision Date: 11/14/2007
Stanford Preliminary Peer Review Report for Nov.14, 2007 PTC Meeting
Stanford Preliminary Peer Review Report for Nov.14, 2007 PTC Meeting
Revision Date: 11/14/2007
October Community Discussions Stanford Medical Center/Shopping Center
October Community Discussions Stanford Medical Center/Stanford Shopping Center
Revision Date: 10/02/2007
Project Frequently Asked Questions
Q&A related to the Shopping Center and Medical Center projects
Medical Center and Shopping Center Project Fact Sheets
Revision Date: 05/05/2008
Stanford Medical Center & Shopping Center Frequently Asked Questions
Revision Date: 01/10/2008
Stanford Medical Center Phase 2 - Project Application
August 2007 to December 2008
Medical Center Application - Cover Letter
Revision Date: 04/20/2009
Medical Center Application - Part 1 - Entitlements
Revision Date: 04/19/2008
Medical Center Application - Part 1 (Figures) - Entitlements
Note: This is a large file (20 MB) and may take several minutes to download.
Revision Date: 04/18/2008
Medical Center Application - Part 2 - Project Objectives
Revision Date: 04/17/2008
Medical Center Application - Part 3 - Project Description
Revision Date: 04/16/2008
Medical Center Application - Part 3 (Figures) - Project Description
Note: This is a large file (14 MB) and may take several minutes to download.
Revision Date: 04/15/2008
Medical Center Application - Part 4 - Project Design
Revision Date: 04/14/2008
Medical Center Application - Part 4 (Figures) - Project Design
Revision Date: 04/13/2008
Medical Center Application - Part 5 - Demographics and Operations
Revision Date: 04/12/2008
Medical Center Application - Part 5 (Figures) - Demographics and Operations
Revision Date: 04/11/2008
Medical Center Application - Part 6 - Utilities
Revision Date: 04/10/2008
Medical Center Application - Part 6 (Figures) - Utiltiies
Revision Date: 04/09/2008
Medical Center Application - Part 7 - Hazardous Materials
Revision Date: 04/08/2008
Medical Center Application - Part 8 - Construction Activities
Revision Date: 04/07/2008
Medical Center Application - Part 9 - Trips and Parking
Revision Date: 04/06/2008
Medical Center Application - Part 10 - Historical Resources
Note: This is a large file (31 MB) and may take several minutes to download.
Revision Date: 04/05/2008
Medical Center Application - Part 10 (Figures) - Historical Resources
Revision Date: 04/04/2008
Medical Center Application - Part 11 - Arborist Report
Revision Date: 04/03/2008
Medical Center Application - Part 12 - Geotechnical reports
Revision Date: 04/02/2008
Medical Center Application - Part 13 - Site Photo Key
Revision Date: 04/01/2008
Stanford Shopping Center Phase 2 - Project Application
Shopping Center - Scheme B Site Plan
Scheme B Site Plan
Revision Date: 08/31/2007
Shopping Center - Scheme B Sections
Scheme B Sections
Revision Date: 08/31/2007
Shopping Center - Revised Data Needs List
Revised Data Needs List
Revision Date: 08/31/2007
Shopping Center - Scheme A Overview
Scheme A Overview
Revision Date: 08/31/2007
Shopping Center - Scheme A Section 2
Scheme A Section 2
Revision Date: 08/31/2007
Shopping Center - Exhibit A - Project Objectives
Exhibit A - Project Objectives
Revision Date: 08/31/2007
Shopping Center - Exhibit B - Existing Building Footprint
Exhibit B - Existing Building Footprint
Revision Date: 08/31/2007
Shopping Center - Exhibit D - Geotechnical Recommendations
Exhibit D - Geotechnical Recommendations
Revision Date: 08/31/2007
Shopping Center - Exhibit C - Geotechnical Investigation
Exhibit C - Geotechnical Investigation
Revision Date: 08/31/2007
Shopping Center - Exhibit E - Geotechnical Recommendations
Exhibit E - Geotechnical Recommendations
Revision Date: 08/31/2007
Shopping Center - Scheme A Section 1
Scheme A Section 1
Revision Date: 08/31/2007
Shopping Center - Scheme A Site Plan
Scheme A Site Plan
Revision Date: 08/31/2007
Shopping Center - Scheme B Site Plan Overview
Scheme B Site Plan Overview
Revision Date: 08/31/2007
Shopping Center- Cover Letter
Shopping Center - Cover Letter
Revision Date: 08/28/2007
Shopping Center Application
Application
Revision Date: 08/27/2007
Stanford Medical Center Phase 1 - Documents
Preliminary meetings December 2006 to August 2007
Stanford University Medical Center Plan Update
Stanford University Medical Center Plan Update
Revision Date: 07/24/2007
July 23, 2007 City Council Meeting
July 23, 2007 City Council Meeting Staff Report and Attachments F and G.
Revision Date: 07/23/2007
July 11, 2007 P&TC Staff Report
July 11, 2007 P&TC Staff Report Stanford Medical Center Area Plan Update
Revision Date: 07/11/2007
May 14, 2007 City Council Meeting
Revision Date: 05/14/2007
April 25, 2007 P&TC Staff Report: Item2A
April 25, 2007 P&TC Staff Report: Item2A Stanford Medical Center Update
Revision Date: 04/25/2007
April 19, 2007 Conceptual Plans
Revision Date: 04/19/2007
January 24, 2007 P&TC Staff Report
Revision Date: 01/24/2007
Preliminary Project Description
Revision Date: 01/05/2007
December 18, 2006 City Manager's Report
Revision Date: 12/18/2006
November 20, 2006 City Manager's Report
November 20, 2006 City Manager's Report
Revision Date: 11/20/2006
Stanford Shopping Center Phase 1 - Documents
Preliminary meetings December 2006 to August 2007
May 14, 2007 City Council Meeting
Revision Date: 05/14/2007
April 25, 2007 P&TC Staff Report: Item2B
April 25, 2007 P&TC Staff Report: Item2B Stanford Shopping Center Update
Revision Date: 04/25/2007
April 19, 2007 Conceptual Plans
Conceptual Plans
Revision Date: 04/19/2007
January 24, 2007 P&TC Staff Report
Revision Date: 01/24/2007
Preliminary Project Description
Revision Date: 01/05/2007
December 11, 2006 City Manager's Report
Revision Date: 12/11/2006
Stanford Shopping Center Phase 1 - Initial Development Studies
120 Room Hotel
Revision Date: 06/19/2007
120 Room Hotel Sections
Revision Date: 06/19/2007
120 Room Hotel Plan 1
Revision Date: 06/19/2007
120 Room Hotel Plan 2
Revision Date: 06/19/2007
120 Room Hotel Plan 3
Revision Date: 06/19/2007
120 Room Hotel Plan 4-5
Revision Date: 06/19/2007
Acceptable Use PolicyAccessibilityYour PrivacySite MapSearch EngineComment FormMissing Content