San Francisquito Creek Joint Powers Authority

In order to address community concerns regarding flooding and environmental preservation on San Francisquito Creek, the City of Palo Alto has worked with neighboring jurisdictions to create the San Francisquito Creek Joint Powers Authority (JPA).

The San Francisquito JPA is an agency empowered to protect and maintain the 14-mile San Francisquito Creek and its 45 square-mile watershed. The JPA was created through the adoption of a joint powers agreement by the member agencies on May 18, 1999.

Current information about the JPA is described in the Watershed Background and Overview and the JPA Agency Timeline.

The agreement cites the following purposes of the JPA:

  • To facilitate and perform bank stabilization, channel clearing, and other Creek maintenance.
  • To plan flood control measures for the San Francisquito Creek watershed.
  • To take actions necessary to preserve and enhance environmental values and instream uses of San Francisquito Creek.
  • To coordinate emergency mitigation and response activities relating to San Francisquito Creek.
  • To make recommendations to Member Entities for funding and alternatives for long-term flood control for Member Entity consideration.

The JPA operational budget is funded through contributions from its member agencies. The JPA receives grants for projects and is conducting strategic planning to establish long-term funding sources for operating costs and capital projects.

The JPA Board welcomes public comment and participation at Board meetings. During JPA Board meetings (see schedule), members of the public may directly address the Board on items of interest to the public that are within the subject matter jurisdiction of the JPA. One half hour (as needed) at the beginning of each Board meeting is devoted to public comment on issues not on the agenda. Public comment is limited to three minutes per speaker during agenda items and during the public comment section of the meeting agenda.

Related Links

U.S. Army Corps of Engineers Sites

Flood Management Resources

  • Army Corps Of Engineers Projects

Member Agencies

Associate Members

Board of Directors

  • Mayor Heyward Robinson, City of Menlo Park, Chair
  • Board member Patrick Kwok, Santa Clara Valley Water District,  Vice-Chairperson/Secretary
  • Mayor Ruben Abrica, City of East Palo Alto,  Director
  • Mayor Peter Drekmeier, City of Palo Alto, Director
  • Board member Richard Gordon, San Mateo County Flood Control District, Director
  • Council member Patrick Burt, City of Palo Alto, Alternate
  • Board member Antonio Estremera, Santa Clara Valley Water District, Alternate
  • Council member Kelly Fergusson, City of Menlo Park, Alternate
  • Board member Rose Jacobs Gibson, San Mateo County Flood Control District, Alternate
  • Council member Carlos Romero, City of East Palo Alto, Alternate

Executive Director

  • Len Materman
    1231 Hoover Street
    Menlo Park, CA 94025
    Phone: 650-561-4580
    E-mail: len@sfcjpa.org
Critical Issues and Questions Regarding the San Francisquito Creek JPA's Initial Capital Project
The San Francisquito Creek Joint Powers Authority (JPA) has prepared a summary of critical issues and questions regarding their Initial Capital Project
[more]

JPA Initial Capital Project Flood Reduction Alternatives Analysis
JPA consultant Philip Williams & Associates prepared an alternatives analysis regarding the feasibility of several options for an Initial Capital Project

[more]

JPA Initial Capital Project Feasibility Study Presentation
JPA consultant Philip Williams & Associates made a presentation to JPA Board on 5/28/09 regarding the feasibility of several options for an Initial Capital Project 
[more]

San Francisquito Creek Hydraulic Study
A San Francisquito Creek Hydraulic Study has been prepared by Noble Engineers and approved by the Army Corps of Engineers
[more]

San Francisquito Creek Hydrology Report
An updated San Francisquito Creek Hydrology Report has been prepared by Santa Clara Valley Water District staff and approved by the Army Corps of Engineers
[more]

San Francisquito Creek Early Implementation Project
The San Francisquito Creek Joint Powers Authority is investigating alternatives for implementation of a local flood management project
[more]

Using Advanced Technology to Understand San Francisquito Creek Floodplain Topography
Presentation to JPA Board by Stanford grad student Kasey Hurlbutt
[more]

JPA Initial Capital Project Presentation to NGOs
San Francisquito Creek JPA staff made a presentation to local NGOs regarding the JPA's Initial Capital Project on July 16, 2009
[more]

Three Cities Neighborhood Associations Community Meeting
Palo Alto City Council Chambers, 3/12/2009
[more]

JPA Meetings
The San Francisquito Creek Joint Power Authority Board of Directors meeting schedule
( visit the jpa agenda page )
[more]

SFEI Presentation of Historical Changes to Lower SF Creek Floodplain
April 23, 2009 presentation by Robin Grossinger of the San Francisco Estuary Institute to the JPA Board on the historical changes to the lower San Francisquito Creek floodplain
[more]

City of East Palo Alto Bay Access Master Plan
A presentation on the City of East Palo Alto's Bay Access Master Plan
[more]

Other JPA Projects
The San Francisquito Creek Joint Powers Authority is actively engaged in the following projects and activities:
[more]

San Francisquito Creek JPA
Works on flooding and environmental preservation
( for more information )
[more]

San Francisquito Creek
Creek Authority News - December 2001
Item Dated: 12/01/2001
Creek Authority News - December 2002
Item Dated: 12/02/2002
Creek Authority News - June 2003
Item Dated: 06/02/2003
Creek Authority News - October 2001
Item Dated: 10/01/2001
Army Corps
Army Corps of Engineers Project Flowchart
Project flowchart for Army Corps of Engineers draft project plan
Item Dated: 04/01/2005
Aviso_Público (in Spanish)
Public Notice issued on April 3, 2006 to announce the study initiation and an initial public meeting for the feasibility study
Item Dated: 04/03/2006
Continuing Authorities Program 205 Presentation
This PowerPoint presentation regarding a proposed U.S. Army Corps of Engineers Continuing Authorities Program (CAP) 205 project was made at the May 22, 2003 JPA Board meeting
Item Dated: 05/23/2003
Corps of Engineers’ 905B Report
San Francisquito Creek Flood Damage Reduction and Ecosystem Restoration General Investigations Program
Item Dated: 03/14/2005
Crescent Park Neighborhood Association Presentation
The following PowerPoint presentation regarding potential interim flood control measures for San Francisquito Creek were made at the January 30, 2006 joint study session of the JPA Board of Directors and the Palo Alto City Council.
Item Dated: 01/30/2006
Description of General Investigation (GI) and Continuing Authorities (CAP) 205 Processes
The following PowerPoint presentation regarding the differences between a U.S. Army Corps of Engineers General Investigation (GI) watershed study, a GI flood damage reduction project, and a Continuing Authorities Program (CAP) project was made at the June 24, 2004 JPA Board meeting
Item Dated: 04/24/2004
Federal Register Notice
The following is an excerpt from the Federal Register issued on April 11, 2006 to announce the U.S. Army Corps of Engineers intent to prepare a joint environmental impact statement/environmental impact report for the San Francisquito Creek Study
Item Dated: 04/11/2006
Presentation on General Investigation (GI) Alternatives
Watershed studies are planning initiatives that have a multi-purpose & multi-objective scope. The study develops a framework of implementation strategies in the context of a comprehensive watershed management plan.
Item Dated: 05/27/2004
Presentation on Potential Inclusion of Tidal Flooding into the Scope of the GI Project
The following PowerPoint presentation regarding the potential inclusion of the tidal floodplain into the scope of the San Francisquito Creek General Investigation Project was made at the April 28, 2005 JPA Board meeting.
Item Dated: 04/28/2005
Public Notice (in English)
Public Notice issued on April 3, 2006 to announce the study initiation and an initial public meeting for the feasibility study
Item Dated: 04/03/2006
Sample Federal Funding Support Letter
Members of the public are encouraged to write to Congresswoman Eshoo and Senators Feinstein and to express support for federal funding for the feasibility study.
Item Dated: 02/01/2006
Schedule_from_SF_Creek_PMP
Item Dated: 09/18/2005
US Army Corps of Engineers Project Partnership Kit
This kit serves as an introduction to help local project sponsors to better understand: 1) the Corps of Engineers organization and authorities 2) the scope of the Corps civil works missions and programs, 3) the project development process by which projects are planned, designed, constructed, and maintained, and 4) the Project Delivery Team (PDT), which the local sponsor is a part of. The kit was prepared to help local sponsors understand how the Corps can help with their water resources and related land problems and opportunities. While the kit has been developed to serve as only an introduction to this partnership, it contains sufficient detail to serve as a reference for many aspects of this cooperative relationship.
Item Dated: 01/01/2001
Project Management Plan
The Army Corps of Engineers has prepared a draft Project Management Plan (PMP) in cooperation with the JPA, which outlines the scope, cost, and schedule for the feasibility phase of the joint JPA/Army Corps San Francisquito Creek Flood Damage Reduction & Environmental Restoration Project. The PMP is currently under review by the JPA staff, the JPA Board, and staff from the JPA member agencies
Project Management Plan (PMP)
A draft Project Management Plan (PMP) in cooperation with the JPA, which outlines the scope, cost, and schedule for the feasibility phase of the joint JPA/Army Corps San Francisquito Creek Flood Damage Reduction & Environmental Restoration Project
Item Dated: 06/08/2006
Project Management Plan (PMP) Cost Table
Item Dated: 06/08/2006
Reference Documents for the Planning Process
The following documents provide reference background information on the processes, regulations, and principles used by the U.S. Army Corps of Engineers on flood damage reduction and ecosystem restoration projects throughout the United States. This information is relevant to the work the Corps is performing in cooperation with the San Francisquito Creek Joint Powers Authority in this watershed.
Army Corps of Engineers Business Process
This regulation establishes philosophy, policy, and guidelines to accomplish all work performed by the U.S. Army Corps of Engineers (USACE)
Item Dated: 08/17/2001
Army Corps of Engineers NEPA Implementation Guidelines
This regulation provides guidance for implementation of the procedural provisions of the National Environmental Policy Act (NEPA) for the Civil Works Program of the U.S. Army Corps of Engineers. It supplements Council on Environmental Quality (CEQ) regulations 40 CFR 1500-1508, November 29, 1978, in accordance with 40 CFR 1507.3, and is intended to be used only in conjunction with the CEQ regulations.
Item Dated: 03/04/1988
Army Corps of Engineers NEPA Implementation Regulations
The National Environmental Policy Act (NEPA) is our basic national charter for protection of the environment. It establishes policy, sets goals (section 101), and provides means (section 102) for carrying out the policy
Item Dated: 11/28/1978
Army Corps of Engineers Planning Guidance
These principles are intended to ensure proper and consistent planning by Federal agencies in the formulation and evaluation of water and related land resources implementation studies.
Item Dated: 04/22/2000
Army Corps of Engineers Planning Manual
Planning with a little “p” is problem solving and it is done throughout the U.S. Army Corps of Engineers organization. Some of it is done by planners in Planning Divisions on planning studies.
Item Dated: 11/01/1996
Army Corps of Engineers Planning Primer
If you were planning, how would you do it? What questions would you ask? What tools would you use? Where would you even start?
Item Dated: 11/03/1997
Army Corps of Engineers Policy Digest
This pamphlet provides a brief summary, in digest form, of the existing administrative and legislative water resources policies and authorities pertinent to the Civil Works activities of the Corps of Engineers
Item Dated: 07/30/1999
Army Corps of Engineers Principles and Guidelines
These Economic and Environmental Principles In accordance with section 103 of the Water and Guidelines for Water and Related Land Resources Planning Act, as amended (42 U.S.C. Resources Implementation Studies have been 1962a-2), the Water Resources Council voted on developed to guide the formulation and September 9, 1982, to repeal the existing evaluation studies of the major Federal water Principles, Standards and Procedures(18 CFR, resources development agencies
Item Dated: 03/10/1983
Article-Federal Register April 2006
Item Dated: 08/15/2007
Meeting-San Francisquito Creek Joint Powers Authority - April 7, 2006
Item Dated: 08/15/2007
San Francisquito Creek Joint Powers Authority - Public Notice April 2006
San Francisquito Creek Joint Powers Authority - Public Notice April 2006
Item Dated: 08/15/2007
Bank Stabilization and Revegetation Recommendations Report
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek. These five projects will be implemented utilizing environmentally-sensitive, "soft engineering" methods of bank stabilization derived from the San Francisquito Creek Bank Stabilization and Revegetation Master Plan. The JPA was able to secure two grants for these projects: 1) A Proposition 12 grant from the State Coastal Conservancy in the amount of $100,000 for the planning of the projects, and 2) A Section 319(h) grant from the State Water Resources Control Board in the amount of $316,580 to begin project implementation. A California Department of Water Resources grant of $72,000 was awarded to extend the Master Plan to Corte Madera Creek in Portola Valley. The JPA is partnering with the Town of Portola Valley on this project.
1. Table of Contents & Introduction
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
2. Recommendations Report - Section 2
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
3. Recommendations Report - Section 3
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
4. Recommendations Report - Section 4
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
5. Recommendations Report - Section 5
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
6. Recommendations Report - Section 6
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
7. Recommendations Report - Section 7
Partnering with creekside landowners, the JPA has initiated a series of five "demonstration" projects to stabilize the degrading banks along San Francisquito Creek.
Item Dated: 06/16/2006
Maintaining Corte Madera Creek
A Citizens' Guide to Creek-Side Property Protection - The JPA prepared Maintaining Corte Madera Creek: A Citizens’ Guide to Creek-Side Property Protection as a tool for the Town of Portola Valley and its residents to use in guiding bank stabilization and revegetation efforts along Corte Madera Creek, a tributary to San Francisquito Creek. The report was created to facilitate communications between the Town and private property owners who wish to address erosion and property loss.
jpa-MCMC01_TOC_and_Executive_Summary
Item Dated: 06/16/2006
jpa-MCMC02_Section_1
Item Dated: 06/16/2006
jpa-MCMC03_Section_2
Item Dated: 06/16/2006
jpa-MCMC04_Section_3
Item Dated: 06/16/2006
jpa-MCMC05_Section_4
Item Dated: 06/16/2006
jpa-MCMC06_Section_5
Item Dated: 06/16/2006
jpa-MCMC07_Figure_1
Item Dated: 06/16/2006
jpa-MCMC08_Figure_2
Item Dated: 06/16/2006
jpa-MCMC09_Figure_3
Item Dated: 06/16/2006
jpa-MCMC10_Figure_4
Item Dated: 06/16/2006
jpa-MCMC11_Figure_5
Item Dated: 06/16/2006
jpa-MCMC12_Appendix_A
Item Dated: 06/16/2006
jpa-MCMC13_Appendix_B
Item Dated: 06/16/2006
jpa-MCMC14_Appendix_C
Item Dated: 06/16/2006
I. December 31, 2005 Storm Information
The following information regarding the storm event of December 31, 2005 was compiled by JPA and member agency staff:
jpa-123105StormAnalysis
Item Dated: 06/16/2006
jpa-HistoricPeakStreamflowRates
Item Dated: 06/16/2006
jpa-RainfallComparison
Item Dated: 06/16/2006
jpa-StreamflowComparison
Item Dated: 06/16/2006
Existing Conditions Report
Executive Summary
Item Dated: 03/08/2006
Historical, Cultural & Landscape Setting
Item Dated: 07/08/2006
Hydrologic & Geomorphic Conditions
Item Dated: 04/08/2006
Introduction
Item Dated: 02/08/2006
Table of Contents
Item Dated: 01/08/2006
The Regulatory Environment
Item Dated: 08/08/2006
Threatened or Endangered Species
Item Dated: 06/08/2006
Vegetation Conditions
Item Dated: 05/08/2006
Master Plan Maps
Map 1
Item Dated: 08/01/2006
Map 10
Item Dated: 08/10/2006
Map 11
Item Dated: 08/11/2006
Map 12
Item Dated: 08/12/2006
Map 13
Item Dated: 08/13/2006
Map 14
Item Dated: 08/14/2006
Map 15
Item Dated: 08/15/2006
Map 16
Item Dated: 08/16/2006
Map 17
Item Dated: 08/17/2006
Map 18
Item Dated: 08/18/2006
Map 2
Item Dated: 08/02/2006
Map 3
Item Dated: 08/03/2006
Map 4
Item Dated: 08/04/2006
Map 5
Item Dated: 08/05/2006
Map 6
Item Dated: 08/06/2006
Map 7
Item Dated: 08/07/2006
Map 8
Item Dated: 08/08/2006
Map 9
Item Dated: 08/09/2006
Master Plan Report
Access Guidelines
Item Dated: 08/08/2006
Contextual Setting
Item Dated: 08/04/2006
Current Permitting Scenario for Proposed Projects on San Francisquito Creek
Item Dated: 08/09/2006
Fisheries and Wildlife Protection and Enhancement Guidelines
Item Dated: 08/07/2006
Introduction
Item Dated: 08/02/2006
Programmatic Permitting/ Conservation Banking
Item Dated: 08/10/2006
Project Overview
Item Dated: 08/03/2006
Restoration and Bank Stabilization Treatments and Plans
Item Dated: 08/05/2006
Table of Contents
Item Dated: 08/01/2006
Vegetation Restoration Guidelines
Item Dated: 08/06/2006
III. San Francisquito Creek Watershed Analysis and Sediment
With funding from a Proposition 13 grant, the San Francisquito Creek Joint Powers Authority (JPA) is managing the preparation of a San Francisquito Creek Watershed Analysis and Sediment Reduction Plan. The Plan partially fulfills NPDES permit provisions that require the co-permittees of the Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPPP) and the San Mateo Countywide Stormwater Pollution Prevention Program SM-STOPPP) within the San Francisquito Creek watershed to assess and implement sediment management measures in the watershed. The Plan is being prepared through a contract with Northwest Hydraulic Consultants and Jones & Stokes.
Appendix A - Stream Survey Sites
Item Dated: 06/16/2006
Appendix B - Trail and Unpaved Road Sites
Item Dated: 06/16/2006
Appendix C - Estimating Erosion Volumes
Item Dated: 06/16/2006
Appendix C1 - Searsville Lake Sediment Budget
Item Dated: 06/16/2006
Appendix C2 - Los Trancos & Bear Creeks Sediment Budget
Item Dated: 06/16/2006
Appendix D - Potential Management Measures
Item Dated: 06/16/2006
Figure 1 - Watershed Study Area
Item Dated: 06/16/2006
Figure 10 - Erosion Model
Item Dated: 06/16/2006
Figure 11 - Historic Landslides
Item Dated: 06/16/2006
Figure 12 - Debris Flow Sources
Item Dated: 06/16/2006
Figure 14 - Natural Average Erosion Rates
Item Dated: 06/16/2006
Figure 15 - Human-related Average Erosion rates
Item Dated: 06/16/2006
Figure 16 - Percent Human-related Erosion
Item Dated: 06/16/2006
Figure 2 - Subwatershed Boundaries
Item Dated: 06/16/2006
Figure 3 - Slope
Item Dated: 06/16/2006
Figure 4 - Geology
Item Dated: 06/16/2006
Figure 5 - Channel Types
Item Dated: 06/16/2006
Figure 6 - Watershed Jurisdictions
Item Dated: 06/16/2006
Figure 7 - Migration Barriers
Item Dated: 06/16/2006
Figure 8 - Road-Stream Intersections
Item Dated: 06/16/2006
Figure 9 - Natural Diversity Database
Item Dated: 06/16/2006
Figures 17 & 18 - Debris Flow & Landslides per Jurisdiction
Item Dated: 06/16/2006
Report Cover
Item Dated: 06/16/2006
Watershed Analysis & Sediment Reduction Report
Item Dated: 06/16/2006
IV. San Francisquito Creek Aquatic Habitat Assessment and Limit
The Aquatic Habitat Assessment and Limiting Factors Analysis is intended to characterize channel and habitat conditions with respect to factors that limit the steelhead population in the San Francisquito Creek watershed.
jpa-AHALFA-Appendix_A1
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_A2
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B1_000
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B2
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B3
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B4
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B5
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_B5_Figure1
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_C1
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_C2
Item Dated: 06/16/2006
jpa-AHALFA-Appendix_D-San_Francisquito_Creek_Reference_State_Model
Item Dated: 06/16/2006
jpa-AHALFA-Figure1
Item Dated: 06/16/2006
jpa-AHALFA-Figure14
Item Dated: 06/16/2006
jpa-AHALFA-Figure2
Item Dated: 06/16/2006
jpa-AHALFA-Final_SF_Creek
Item Dated: 06/16/2006
jpa-legend_location_sheet
Item Dated: 06/16/2006
jpa-SFCreek_GapAnalysis
Item Dated: 06/16/2006
jpa-SFCreek_Geography_TechMemo
Item Dated: 06/16/2006
jpa-SFCreek_SurveyPlan
Item Dated: 06/16/2006
jpa-sheet01
Item Dated: 06/16/2006
jpa-sheet02
Item Dated: 06/16/2006
jpa-sheet03
Item Dated: 06/16/2006
jpa-sheet04
Item Dated: 06/16/2006
jpa-sheet05
Item Dated: 06/16/2006
jpa-sheet06
Item Dated: 06/16/2006
jpa-sheet07
Item Dated: 06/16/2006
jpa-sheet08
Item Dated: 06/16/2006
jpa-sheet09
Item Dated: 06/16/2006
jpa-sheet10
Item Dated: 06/16/2006
jpa-sheet11
Item Dated: 06/16/2006
jpa-sheet12
Item Dated: 06/16/2006
V. Watershed Maps
jpa-jurisdictional-boundries
Item Dated: 06/16/2006
jpa-WATERSHED-BASEMAP
Item Dated: 06/16/2006
VI. Upstream, Downstream, Across the Stream
This report posits that the San Francisquito Creek Joint Powers Authority (JPA) can only be a truly integrated watershed group with membership of the two upper watershed towns of Portola Valley and Woodside.
jpa-tomlinson-report2
Item Dated: 06/16/2006
VII. Levee Restoration Project
The JPA Board of Directors approved a resolution at the September 27, 2001 Board meeting enabling final design and construction of the Levee Restoration Project to become reality.
jpa-3Responses-456
Item Dated: 06/16/2006
jpa-IntroandPD
Item Dated: 06/16/2006
Acceptable Use PolicyAccessibilityYour PrivacySite MapSearch EngineA-Z IndexComment FormMissing Content

 
City of Palo Alto City Hall - 250 Hamilton Ave, Palo Alto, CA 94301 | Main Telephone Number 650-329-2100 8am-5pm M-Th, Alt Fridays