Gas Surveying Project

Surveying Services for FY 2016



 Project Overview
Topographic surveying to map location of existing utilities and road features (e.g. gas and water meters, sewer cleanouts, electrical boxes, service and main valves, etc.)

Duration
May 23, 2016 to September 26, 2016

Location
Click here for the map (Group 1 areas will be surveyed first)

Notes
Access to Gas meters on private property may be required

The contact information for this projects' consultant is as follows:

Andrew K. Holmes, PLS
Triad Holmes Associates
777 Woodside Road, Suite 2A
Redwood City, CA 94061
T: (650) 366-0216
F: (650) 366-0298

The contact information for the CPAU Project Manager is as follows:

Tuan Nguyen, P.E.
Engineer | Design and Asset Management Group
WGW Utilities Engineering and Design
1007 Elwell Court, Palo Alto, CA 94303
T: (650) 566 - 4547
Last Updated: May 5, 2016