Forms, Permits and Applications

Industrial Waste Permitting
Permit Issuance
Phone: 650-329-2598
Fax: 650-494-3531

Water Quality reviews the plans for the following:
  • New facilities
  • Remodels
  • “Spec” buildings
  • Laboratories
  • Facilities with hazardous materials storage or use
  • Commercial facilities with discharges
  • Food service facilities
  • Photo Shops
  • Auto Service
  • Dry Cleaners
  • Medical
  • Dental
  • Buildings with Elevators with discharge lines
  • Buildings with Loading docks
  • Buildings with Cooling towers
  • Buildings with Proposed high water use
  • Residential
  • Large/multi-unit Residential Projects
  • Projects with Underground parking
  • Projects with Swimming pools (other than single family)
  • Projects with Elevators with discharge lines
Last Updated: Oct 4, 2011
Forms and Permit Applications
This section contains forms to print from your computer. You cannot submit the data online at this time.
About these Forms
Revision Date: 6/4/2007
Building Plan Submissions
Sewer Use Questionnaire
Water Quality Questionnaire (Sewer Use Questionnaire) for new and remodel projects
Revision Date: 6/6/2006
Common Review Comments And Corrections
Common Review Comments And Corrections
Revision Date: 6/6/2006
Dental Practice Requirements and Information
Amalgam waste reduction requirements and other information
Dental Section of the Sewer Use Ordinance
Requirements for dental facilities that remove or place amalgam fillings excerpted from the city of Palo Alto ordinance.
Revision Date: 6/5/2006
Inspection Checklist
Dental office inspection checklist regarding amalgam waste management practices
Revision Date: 6/2/2006
Summary of Requirements - Program Overview Fact Sheet
Dental amalgam recovery program overview
Revision Date: 6/2/2006
Permit Issuance
A discharge permit is required for the discharge of any process water from the facilities or activities below.
Automotive Repairs/Car Washes
Industrial waste discharge permit application (for discharge to the sanitary sewer system) for vehicle service facilities
Revision Date: 6/6/2006
Contaminated Ground Water
Application guidelines for dischargers of contaminated groundwater to the regional water quality control plant
Revision Date: 6/6/2006
Discharge Application For Exceptional Wastewater
Discharge Application For Exceptional Wastewater form, Sampling Instructions and Designation of Authorized Representative Form used for: One Time Discharge<2000 gallons, One Time Discharge>2000 gallons, and other exceptions.
Revision Date: 6/6/2006
Machine Shops
Industrial waste discharge permit application (for discharge to the sanitary sewer system) for machine shop facilities
Revision Date: 6/6/2006
Photo Processing Facilities
Silver Reduction Ordinance Treatment Compliance Plan And Permit Application for, Commercial Photoprocessing, Medical Practice, Professional Photography, Dental Practice, Printing Graphic Arts, and other
Revision Date: 6/6/2006
Preparation of Toxic Organic Management Plan
Instructions for preparing a Toxic Organic Management Plan
Revision Date: 6/6/2006
Recycled Water Reuse Application Form and Instructions
The Palo Alto Regional Water Quality Control Plant will permit and provide recycled water to many commercial and government agencies for residential landscaping, parks, industrial parks, sod nurseries, pesticide spraying, decorative fountains, and many more applications.
Revision Date: 3/5/2013
Septic Hauler Permit Instruction Letter
Hauled Liquid Waste Discharge Permit - application & guidelines
Revision Date: 2/28/2013
Spill Control Guidelines
A list of topics that must be addressed in a Spill Control Plan
Revision Date: 7/2/2009
Report Forms
Designation of Authorized Representation
Various reports require the signature of a principal executive officer of at least the level of vice-president if the permittee is a corporation OR a general partner or proprietor if the permittee is a partnership or sole proprietorship.
Revision Date: 7/2/2009
Ground Water Emergency Shutdown Form
Emergency shutdown groundwater discharger contact information and emergency shutdown procedures
Revision Date: 6/4/2007
Ground Water PRCC
Ground Water PRCC/GSAR - Groundwater semi-annual report
Revision Date: 6/6/2006
Sampling Instructions and Guidelines
Ground Water Sampling Instructions
Sampling is required from all dischargers to the Regional Water Quality Control Plant (RWQCP)
Revision Date: 6/6/2006
Industrial Waste Sampling Instructions
Industrial wastewater sampling instructions
Revision Date: 6/6/2006
Self Monitoring Data Form
Industrial users self-monitoring log
Revision Date: 6/6/2006
Sewer Use Ordinance - Chapter 16.09
Chapter 16.09 of the Palo Alto Municipal Code regulates discharges to the sanitary sewer, storm drain system, creeks and the Bay.
Sewer Use Ordinance
The Palo Alto Sewer Use Ordinance regulates discharges to to sanitary sewer system, the storm drain system, creeks and the Bay.
Revision Date: 7/14/2010