2002

Approval of a contract with P & J Utility Company in the amount of $1,372,394 for Water Main Replacement Project 15
Revision Date: 6/27/2006
Award of contract to Monterey Mechanical Co. in the amount of $638,000 for the Sludge Thickener Rehabilitation Project at the Water Quality Control Plant (Wastewater Treatment Capital Improvement Program Project #8021)
Revision Date: 6/27/2006
Award of contract to Monterey Mechanical Co. in the amount of $836,000 for the Blower Systems Replacement Project for the Water Quality Control Plant (Wastewater Treatment Capital Improvement Program Project #8021)
Revision Date: 6/27/2006
351 Channing Avenue: Final subdivision map to subdivide a 1.00-acre parcel into ten single family lots with detached accessory structures, 00-SUB-08
Revision Date: 6/27/2006
325 Channing Avenue: Final Subdivision Map to Subdivide a 1.18-acre parcel into 36 air space condominiums, 00-SUB-07
Revision Date: 6/27/2006
325 Channing Avenue: Final subdivision map to subdivide a 1.18-acre parcel into 36 air space condominiums, 00-SUB-07
Revision Date: 6/27/2006
315 Homer Avenue: Final subdivision map to subdivide a 0.82-acre parcel into 30 air space condominiums, 00-SUB-06
Revision Date: 6/27/2006
315 Homer Avenue: Final Subdivision Map to Subdivide a 0.82-acre parcel into 30 air space condominiums, 00-SUB-06
Revision Date: 6/27/2006
Approval of extension of the Santa Clara County Abandoned Vehicle Abatement Service Authority for second 10-year term and the City of Palo's continued participation
Revision Date: 6/27/2006
Review of preliminary design and cost estimates of the Homer Tunnel Project, and request for Council direction on project and approval of consultant contract with Nolte Associates, Inc. in the amount of $433,649 for design services for the Homer Avenue Caltrain Undercrossing, Capital Improvement Program Project 10121
Revision Date: 6/27/2006
Approval of Change Order No. 3 to Contract No. C1129753 with Bragato Construction Company in the amount of $19,891 to provide additional barriers, amenities and plants at the Duck Pond Parking Lots
Revision Date: 6/27/2006
Approval of Budget Amendment Ordinance in the amount of $175,000, receiving from California Arts Council Grant to create Capital Improvement Project 10224, Children's Theatre sound and light systems upgrade
Revision Date: 6/27/2006
Proposal by the International School to lease an estimated 0.75 acre site at the Palo Alto Baylands Athletic Center to construct an athletic field for Joint City and International School uses
Revision Date: 6/27/2006
Palo Alto Water Main Distribution System Flushing Program - Status Report
Revision Date: 6/27/2006
Natural Gas Purchase Plan for Fiscal Year 2002-03
Revision Date: 6/27/2006
Electric Transmission Services Options for the City after the expiration of the Interconnection Agreement with Pacific Gas & Electric Company on March 31, 2002
Revision Date: 6/27/2006
Approval of appointment, Director of Planning and Community Environment
Revision Date: 6/27/2006
Approval of an agreement in the amount of $65,000 with Community Housing, Inc. for funds allocated during Fiscal Year 2000/01 under the Community Development Block Grant Program
Revision Date: 6/27/2006
Resolution of the Council of the City of Palo Alto amending Chapter 10, Section 1002, of the Merit System Rules and Regulations (causes for discipline) to include violation of California Drug-Free Workplace Act of 1990
Revision Date: 6/27/2006
Palo Alto Intermodal Transit Center: Endorsement of conceptual Plan and Authorization of next steps
Revision Date: 6/27/2006
2051 El Camino Real [01-PC-04]: Request by Mehmood Taqui on behalf of Oak Shadows LLC to rezone a 4,938 square foot parcel from CN District to PC District to construct a 4,555 square foot, three story, mixed use building
Revision Date: 6/27/2006
Grant Funding Report FY 2001-02
Revision Date: 6/27/2006
Utilities Department Legislative Priorities
Revision Date: 6/27/2006
City of Palo Alto's Investment Activity Report for the Second Quarter, Fiscal Year 2001-02
Revision Date: 6/27/2006
Transmittal of Library Advisory Commission recommendations regarding alternatives to the New Library Plan and identification of issues surrounding Library Building Expansion projects
Revision Date: 6/27/2006
Complaints made by members of the public to the Police Department, Third and Fourth Quarters of 2001
Revision Date: 6/27/2006
Approval of Amendment to existing Contract No. C135651 with Planergy International for the emergency rental of a 5-megawatt backup diesel generator changing the contract amount from $392,785 to $532,785
Revision Date: 6/27/2006
Approval of Amendment Number Two to the Urban Ministry of Palo Alto Agreement S2135801 to increase funding in the amount of $28,000 for Fiscal Year 2001-02
Revision Date: 6/27/2006
Approval of a contract with Del Conte's Landscaping, Inc. in the amount of $164,190 for Bol Park Facilities Improvements and Irrigation Improvements
Revision Date: 6/27/2006
Allocation of Community Development Block Grant Funds on an emergency basis to assist in the completion of Clara Mateo Alliance's Elsa Segovia Homeless Center for Women and Children
Revision Date: 6/27/2006
2475 Hanover Street: City Council review and adoption of revised mitigated negative declaration and approval of conditions for the demolition of two buildings on a 4.7-acre site in the LM Zoning District and the construction of a two-story office building comprising 81,928 square feet. Parking facilities include 146 underground parking spaces and 127 surface parking spaces. [Files: 01-ARB-100, 01-EIA-15]
Revision Date: 6/27/2006
Approval of Resolution Amending Section 1801 of the Merit System Rules and Regulations regarding the Memorandum of Agreement between the City of Palo Alto and the Palo Alto Fire Chiefs' Association, and Resolution adopting compensation plan for Fire Chiefs' Association Management Personnel
Revision Date: 6/27/2006
3924 El Camino Real [01-AP-07]: Appeal of the Director of Planning and Community Environment's approval, after review and recommendation by the Architectural Review Board (ARB), of an ARB application [01-ARB-03] to allow facade upgrades and landscaping improvements to two existing one-story buildings. Project withdrawn; Appeal terminated
Revision Date: 6/27/2006
Housing Element of the Comprehensive Plan
Revision Date: 6/27/2006
2001-02 Adjusted Budget - Midyear amendments and Capital Improvement Program status
Revision Date: 6/27/2006
California ballot measures for March 5, 2002 election
Revision Date: 6/27/2006
Council Approval of Disposition and Development Agreement between the City of Palo Alto and Palo Alto Housing Corporation and Oak Court Apartments, L.P., including a Budget Amendment Ordinance to fund a development subsidy loan ($1,960,000) and certain property holding and clearing costs ($143,000)
Revision Date: 6/27/2006
Contract with TJKM Transportation Consultants for a Citywide Global Positioning System (GPS) - Based Vehicle Speed and Travel Time Study
Revision Date: 6/27/2006
Approval of Change Order No. 1 to Contract No. C0115210 with Hastings Landscape Conservation Services in the amount of $17,445 to provide additional Vegetation Management Services for Byxbee Park
Revision Date: 6/27/2006
Commercial Downtown (CD) Monitoring Report for September 1, 2000 to August 31, 2001
Revision Date: 6/27/2006
Approval of Contract with Larry Walker Associates for consultant services to assist the Regional Water Quality Control Plant in fulfilling the requirements of the Wastewater Discharge Permit
Revision Date: 6/27/2006
Approval of a resolution which authorizes: 1) issuance and sale of not to exceed $35,460,000 principal amount of 2001 University Avenue Off-Street Parking Assessment District Limited Obligation Improvement Bonds to construct two new parking garages; and 2) official actions related to the bond issuance
Revision Date: 6/27/2006
Ordinance to establish development impact fees for parks, community centers and libraries
Revision Date: 6/27/2006
Neighborhood Traffic Calming Program
Revision Date: 6/27/2006
Request of property owners of a portion of tract 796 for consideration of single story height combining zoning in the Greer Park neighborhood (Van Auken Circle)
Revision Date: 6/27/2006
Approval of a Budget Amendment Ordinance transferring $46,238 from CIP 19109, Police Information Systems Master Plan, to provide an additional appropriation for CIP 19312 Fire/Communications Computer System
Revision Date: 6/27/2006
Recommended increase to commercial housing in-lieu of fee and transportation impact fee for Stanford Research Park/El Camino Real Service Commercial Zone
Revision Date: 6/27/2006
Downtown parking structures: construction parking mitigation measures
Revision Date: 6/27/2006
Results of Main Library/Art Center Expansion Site Feasibility Study and recommendation to proceed to conceptual design for two alternatives
Revision Date: 6/27/2006
Approval of a contract with ABC Services in the amount of $136,850 for cleaning and video inspection of sanitary sewer pipelines (IFB 137634)
Revision Date: 6/27/2006
Approval of Amendment No. 1 to Contract CS124851 with Raines, Melton & Carella, Inc. in the amount of $60,000 for services to facilitate implementation of the long-term goals at the Regional Water Quality Control Plant
Revision Date: 6/27/2006
Approval of Change of Order No. 1 to Contract No. S2134507 with D.H.R. Construction in the amount of $100,444 to complete the Cart Paving Services Project at the Palo Alto Golf Course
Revision Date: 6/27/2006
Approval of a Contract with Del Conte's Landscaping, Inc. in the amount of $268,645 for Seale Park Facilities Improvements and Irrigation Improvements
Revision Date: 6/27/2006
Authorization for staff to circulate the proposed Redevelopment Plan for Edgewood Redevelopment Project (Redevelopment Plan) for review and comment and referral of the proposed Redevelopment Plan to the Planning Commission and affected taxing entities, Approval of the Preliminary Report for the adoption of the Redevelopment Plan for the Edgewood Redevelopment Project Area (Preliminary Report) and referral to each affected taxing entity, and Authorization for staff to circulate for review and comment the Draft Environmental Impact Report for the Edgewood Redevelopment Project (DEIR)
Revision Date: 6/27/2006
Approval of a Contract with ELS Architecture and Urban Design in the amount of $191,144 for conceptual architectural design services for the Main Library Expansion, Capital Improvement Program Project 10204
Revision Date: 6/27/2006
Approval of Contract with Mark Cavagnero Associates in the amount of $153,000 for conceptual architectural design services for the Art Center expansion and site, Capital Improvement Program Project 10204
Revision Date: 6/27/2006
Award of Contract with Vanguard Construction in the amount of $543,420 for FY 2001-2002 Phase 2 Sidewalk Replacement Project
Revision Date: 6/27/2006
Development Center Cost Recovery Analysis and Recommendations
Revision Date: 6/27/2006
Amendments to the format of the FY 2002-03 Operating Budget
Revision Date: 6/27/2006
Request approval of a Budget Amendment Ordinance for authorizing receipt of public library fund monies and an additional appropriation in the amount of $92,550 for Capital Improvement Project Number 10204, Library Master Plan
Revision Date: 6/27/2006
Direction from the City Council regarding the Opportunity Center Project proposed by the Community Working Group at 33/39/45 Encina Way in Palo Alto
Revision Date: 6/27/2006
Fiber to the Home Trial program update and trial participation fee resolution
Revision Date: 6/27/2006
Approval of a Budget Amendment Ordinance in the amount of $40,000 for the construction of a prefabricated bridge at the Arastradero Preserve -- Capital Improvement Project 10001, Open Space Trails
Revision Date: 6/27/2006
Extension of existing natural gas master purchase agreements for a five year term
Revision Date: 6/27/2006
Approval of Contract Amendment #1 to Group 4 Architecture, Research + Planning, Inc., in the amount of $258,485 for conceptual architectural design services for the Mitchell Park Library & Community Center Expansion Project, Capital Improvement Project 10204
Revision Date: 6/27/2006
2475 Hanover Street: Supplement to Staff Report of February 19, 2002 (CMR:133:02)
Revision Date: 6/27/2006
2001 Shoreline Concert Season
Revision Date: 6/27/2006
Finance Committee recommended changes to the 2001-02 Adjusted Budget - Midyear Amendments and Capital Improvement Programs status
Revision Date: 6/27/2006
Proposal for funding future storm drain improvements
Revision Date: 6/27/2006
Update on alternative electric supply portfolio plan
Revision Date: 6/27/2006
Approval of an amendment to increase the contract amount with Flynn and Associates for electric regulatory and technical assistance for $75,000 for fiscal year 2001-02 and for $75,000 for fiscal year 2002-03
Revision Date: 6/27/2006
Receipt of California Law Enforcement Equipment Program (CLEEP) funds in the amount of $48,738
Revision Date: 6/27/2006
Award of contract to Monterey Mechanical Co. Inc. in the amount of $114,960 for the sludge pipe hot water flushing system for the water quality control plant (wastewater treatment capital improvement program project #8021)
Revision Date: 6/27/2006
Request for direction regarding AT&T/Comcast transfer of ownership process and cable rate regulation
Revision Date: 6/27/2006
Status report on proposed changes to tidal floodplain boundary
Revision Date: 6/27/2006
Additional information regarding proposal by International School for consideration of public/private partnership to construct pathway and playfields
Revision Date: 6/27/2006
Award of Contract to Power Engineering contractors in the amount of $162,000 for the Filter Valves Replacement Project at the Water Quality Control Plant (Wastewater Treatment Capital Improvement Program #8021)
Revision Date: 6/27/2006
Status report on process and schedule to develop the Environmental Services Center
Revision Date: 6/27/2006
Ordinance to establish development impact fees for parks, community centers and libraries
Revision Date: 6/27/2006
Recommended increase to comercial housing in-lieu fee; elimination of exemptions and other administrative changes; and increase to transportation impact fee for Stanford Research Park/El Camino Real Service Commercial Zone
Revision Date: 6/27/2006
Status report on Zoning Ordinance Update
Revision Date: 6/27/2006
Approval of Amended Joint Funding Agreement related to Countywide radio interoperability and public safety data communications network project
Revision Date: 6/27/2006
Resolution of Support for Senate Bill 1870, the Bay Area Water Reliability Act, and Assembly Bill 2058, the Bay Area Regional Water Supply and Conservation Agency Act
Revision Date: 6/27/2006
800 High Street (02-PC-01) - Initiation of a preliminary review (PAMC 18.97.030) for a proposed planned community rezoning consisting of 61 residential condominium units and 1,921 square feet of retail space. The proposed project site consists of three parcels that total 42,000 square feet
Revision Date: 6/27/2006
Resolution determining that the public interest and necessity require the acquisition of temporary construction easements at 314 Lytton Avenue and 420 Florence Street for the Downtown Parking Structures (CIP 19530)
Revision Date: 6/27/2006
Request for Council Approval of resolution amending section 1401 of the Merit System Rules and Regulations regarding the memorandum of agreement between the City of Palo Alto and Local 715, Service Employees International Union (SEIU) for classified personnel and resolution adopting the compensation plan for local 715, (SEIU)
Revision Date: 6/27/2006
Proposed criteria used to develop housing sites inventory
Revision Date: 6/27/2006
Approval of Public Improvement Corporation financial statements
Revision Date: 6/27/2006
Resolution Authorizing the City Manager to approve and manage program supplements to the master agreement between the State of California and the City of Palo Alto for the Homer Avenue Caltrain Undercrossing Project: Adoption of a mitigated negative declaration and project approval; the report on schedule and funding status for the Homer Avenue Caltrain Undercrossing, Capital Improvement Program Project 10121
Revision Date: 6/27/2006
535 Everett Avenue, XM Satellite Radio (01-PC-05): Planned Community (PC) Zoning District application by XM Satellite Radio to amend zoning district PC-2145 to allow building-mounted satellite radio relay facilities
Revision Date: 6/27/2006
Proposed Fiscal Year 2002-03 Human Resource Allocation Process Funding Recommendations
Revision Date: 6/27/2006
Approval of Increase in the expenditure limit of the bail shuttle bus service administration agreement with the Peninsula Corridor Joint Powers Board for the Palo Alto Shuttle Project
Revision Date: 6/27/2006
Resolution Approving a Caltrans program supplement agreement between the City of Palo Alto and Caltrans for the Embarcadero Road Pedestrian/Bike Bridge and Bike Path Project (Capital Improvement Program project - 19310)
Revision Date: 6/27/2006
Approval of Amendment No. One to Sand Hill Corridor maintenance agreement between the City of Palo Alto and the Board of Trustees of the Leland Stanford Junior University for Sand Hill Road Corridor projects
Revision Date: 6/27/2006
Award of Contract to offset AGRI Industries, Inc. in an amount not to exceed $120,000 per year for the transportation and recycling of the ash from the Palo Alto Regional Water Quality Control Plant
Revision Date: 6/27/2006
Proposed fiscal year 2002-02 Community Development Block Grant (CDBG) Funding Allocations and draft action
Revision Date: 6/27/2006
Approval of a resolution for vacation of public service easements for utilities and roadways on Quarry Road, Arboretum Road, Sand Hill Road, Pasteur Drive, and near Hoover Pavilion; approval of resolutions to initiate annexation proceedings for land along the south side of Sand Hill Road, two areas along the south side of Quarry Road and the new Pasteur Drive and adjacent land between Sand Hill Road and Welch Road
Revision Date: 6/27/2006
Proposed Milestones for Council "Top 5" Priorities
Revision Date: 6/27/2006
Award of contract to Streamline Incorporated for water/ wastewater operations contract services (IFB #142310) in the amount of $242,880
Revision Date: 6/27/2006
Approval of contract in the amount of $119,000 with Uptown services for Fiber to the Home business case development services
Revision Date: 6/27/2006
Approval of Amendment no. 2 to contract no. C1126141 with Underground Construction for the 2000-2001 Utility trench and substructure installation in the amount of $200,000
Revision Date: 6/27/2006
Resolution making a determination of zero property tax exchange on the annexation of lands of Conroe at 800 Los Trancos Road to the West Bay Sanitary District
Revision Date: 6/27/2006
City of Palo Alto's investment activity report for the third quarter, fiscal year 2001-02
Revision Date: 6/27/2006
Ordinance of the Council of the City of Palo Alto amending Section 22.04.34 of Chapter 22.04 of the Palo Alto Municipal Code to prevent the use of motorized vehicles or moped "off road" in open space areas
Revision Date: 6/27/2006
Award of contract in the amount of $149,432 to Sposeto Engineering, Inc. for Storm Drain Repair (Capital Improvement Program project 47711)
Revision Date: 6/27/2006
Thresholds of significance for environmental review
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH BRAGATO CONSTRUCTION COMPANY INC. IN AN AMOUNT NOT TO EXCEED $474,290 FOR CONSTRUCTION OF HARBOR POINT AND BYXBEE PARK PARKING LOT IMPROVEMENTS
Revision Date: 6/27/2006
Options for phasing library and other community facilities projects
Revision Date: 6/27/2006
Transportation Impact Fee Level
Revision Date: 6/27/2006
Authorizing the filing of an application with the California Energy Commission for $77,250 incentive grant funding for Peak Load Reduction/Energy Efficiency Program for Wastewater Facilities
Revision Date: 6/27/2006
Quarterly report on demographic data collection (profiling)
Revision Date: 6/27/2006
Modifications to fence height and floor area ratio (far) regulations for residents impacted by San Francisquito Creek Joint Powers Authority Floodwall Replacement Project
Revision Date: 6/27/2006
Approval of budget amendment ordinance in the amount of $25,000, receiving a grant from the Palo Alto Art Center Foundation and transferring City matching funds of $25,000 into CIP 10204, Library Master Plan
Revision Date: 6/27/2006
Adoption of a revised resolution authorizing the City Manager to execute an agreement for a grant from the Coastal Commission San Francisco Bay Trail Project for improvements to trail segments along the Faber-Laumeister Tract in the Baylands
Revision Date: 6/27/2006
Zoning Ordinance Update-Consultant Services
Revision Date: 6/27/2006
Adoption of a resolution authorizing the City Manager to file an application for 2002/2003 Transportation Development Act Funds for bicycle and pedestrian projects, including commitment to make up any funding deficit on the Homer Avenue Caltrain Undercrossing Project
Revision Date: 6/27/2006
Annual Public Review of compliance of development agreement with Stanford University for the Sand Hill Corridor Projects
Revision Date: 6/27/2006
Approval of resolutions to approve annexations of land along the south side of Sand Hill Road, two areas along the south side of Quarry Road and the new Pasteur Drive and adjacent land between Sand Hill Road and Welch Road
Revision Date: 6/27/2006
APPROVAL OF SECOND AMENDMENT TO THE 1996 MEASURE B PAVEMENT MANAGEMENT PROGRAM COOPERATIVE AGREEMENT WITH THE SANTA CLARA VALLEY TRANSPORTATION AUTHORITY; APPROVAL OF A BUDGET AMENDMENT ORDINANCE FOR THE FISCAL YEAR 2001-02 TO ACCEPT REVENUE FROM THE STATE TRAFFIC CONGESTION RELIEF FUND AND THE VTA, AND TO PROVIDE AN ADDITIONAL APPROPRIATION TO THE STREET MAINTENANCE CAPITAL PROJECT, NUMBER 9630 IN THE AMOUNT OF $259,916; AND APPROVAL OF A CONTRACT WITH DESILVA GATES CONSTRUCTION IN THE AMOUNT OF $2,544,081 FOR THE 2002 STREET MAINTENANCE CAPITAL IMPROVEMENT PROGRAM PROJECT 9630
Revision Date: 6/27/2006
2560 Embarcadero Road (Sea Scout Base): Recommendation from the Historic Resources Board to designate this building to the City of Palo Alto's Historic Inventory in Category 1 pursuant to Municipal Code Chapter 16.49 (Historic Preservation Ordinance); and recommendation by staff to delay designation until a structural engineering report is completed
Revision Date: 6/27/2006
Approval and adoption of park improvement ordinance for the installation of a restroom at Hoover Park, 2901 Cowper, and approval of budget amendment ordinance in the amount of $75,000, receiving a donation from Perry & Arrillaga foundation into CIP 10010, park facilities improvements
Revision Date: 6/27/2006
Adoption of a resolution authorizing the City Manager to apply for a grant and execute an agreement with the State of California for a Roberti-Z'Berg-Harris Urban Open Space and Recreation grant for improvements to parking lots at the Baylands
Revision Date: 6/27/2006
Adoption of a resolution authorizing the City Manager to apply for a grant and execute an agreement with the State of California for a Roberti-Z'Berg-Harris Urban Open Space and Recreation grant for improvements to parking lots at the Baylands
Revision Date: 6/27/2006
Approval of employment agreement with Director of Administrative Services
Revision Date: 6/27/2006
900 High Street: Recommendation from the Historic Resources Board at the request of the owners, the Santana family, to designate a building designed by Birge Clark to the City of Palo Alto's Historic Inventory in Category 2 pursuant to municipal code chapter 16.49 (Historic preservation ordinance)
Revision Date: 6/27/2006
AGREEMENT BETWEEN THE CITY OF PALO ALTO AND THE LOS ALTOS HILLS COUNTY FIRE DISTRICT FOR INTERJURISDICTIONAL FIRE PROTECTION AND EMERGENCY MEDICAL RESPONSE SERVICE FROM CITY OF PALO ALTO FIRE STATION NUMBER 8
Revision Date: 6/27/2006
2051 El Camino Real [01-PC-04]: Request by Mehmood Taqui on behalf of Oak Shadows LLC to rezone a 4,938 square foot parcel from CN district to PC district to construct a 4,555 square foot, three story, mixed use building
Revision Date: 6/27/2006
Approval of budget amendment ordinance in the amount of $800,000 for a residential real estate loan to the Director of Administrative Services
Revision Date: 6/27/2006
Approval of Professional Engineering Services contract with Carollo Engineers in the amount of $2,324,637 for the design, project management and administration of Phase I: Reservoir booster station improvements; distribution system water quality enhancement; existing booster station improvements; and reservoir, pump station and well land acquisition
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH GEOLINE POSITIONING SYSTEMS, INC. IN THE AMOUNT OF $72,847 FOR PROTOTYPE GLOBAL POSITIONING SATELLITE SYSTEM (GPS) TO LOCATE UTILITY INFRASTRUCTURE, FOR USE WITH THE CITY OF PALO ALTO GEOGRAPHIC INFORMATION SYSTEM
Revision Date: 6/27/2006
Approval of amendment No. 1 to contract No. C-123181 with Energy Masters, International in the amount of $150,000 for comprehensive energy project management services
Revision Date: 6/27/2006
Approval of agreement between the member agencies of the San Francisquito Creek Joint Powers Authority for the funding and maintenance of the San Francisquito Creek Levee Restoration Project
Revision Date: 6/27/2006
Award of Contract to Allied Information and Service for 7.5 percent of net collected revenue for all Advanced Life Support (ALS) and Basic Life Support (BLS) ambulance transport revenue collection services
Revision Date: 6/27/2006
Public Hearing: Fiscal Year 2002/03 Community Development Block Grant funding allocations and annual action plan update of the consolidated plan for the period 2000-2005; and recommendation to adopt a resolution of the Council of the City of Palo Alto consenting to the Housing Authority of Santa Clara County transacting business within the City of Palo Alto for the purpose of acquiring land and developing affordable housing on the parcels located at 33, 39 and 45 Encina Avenue
Revision Date: 6/27/2006
Request for proposals to lease the Roth Building 300 Homer Avenue, Palo Alto
Revision Date: 6/27/2006
Joint Public Hearing on Redevelopment Plan and Final Environmental Impact Report by Redevelopment Agency and City Council for June 17, 2002
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH LEO TIDWELL EXCAVATING CORPORATION IN THE AMOUNT OF $89,000 FOR CONSTRUCTION OF UNDERGROUND ELECTRIC DUCT SYSTEMS AT THE GREEN ACRES SUBDIVISION
Revision Date: 6/27/2006
Mitchell Park Library Joint Venture Project
Revision Date: 6/27/2006
APPROVAL OF CONTRACT WITH MDA ENGINEERING INC. IN THE AMOUNT OF $77,500 FOR THE DESIGN AND CONSTRUCTION MANAGEMENT OF THE REGIONAL WATER QUALITY CONTROL PLANT OPERATIONS BUILDING HEATING, VENTILATION AND AIR CONDITIONING UPGRADE PROJECT
Revision Date: 6/27/2006
USE OF ORDINANCE PROVISIONS FOR ADMINISTRATIVE CITATIONS AND ADMINSTRATIVE COMPLIANCE ORDERS BY THE PUBLIC WORKS OPERATIONS DIVISION
Revision Date: 6/27/2006
Approval of amendment to Palo Alto municipal code chapter 9.10 regulating leaf blowers extending prohibition of combustion-powered blowers in residential areas until 2005
Revision Date: 6/27/2006
ZONING ORDINANCE UPDATE – WORK PROGRAM AND TIMELINE
Revision Date: 6/27/2006
RESOLUTIONS APPROVING INSTALLATION OF NEW MIDBLOCK CROSSWALK ON CHANNING AVENUE BETWEEN BRYANT AND WAVERLEY STREETS AND REMOVING AN EXISTING MID-BLOCK CROSSWALK ON HOMER AVENUE BETWEEN BRYANT AND WAVERLEY STREETS
Revision Date: 6/27/2006
INFORMATIONAL REPORT ON THE SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM
Revision Date: 6/27/2006
PUBLIC HEARING: ASSESSMENTS FOR CALIFORNIA AVENUE DISTRICT PARKING BONDS PLAN G - FISCAL YEAR 2002-03
Revision Date: 6/27/2006
APPLICATION FOR CALIFORNIA READING AND LITERACY IMPROVEMENT AND PUBLIC LIBRARY CONSTRUCTION AND RENOVATION BOND ACT OF 2000 FUNDS FOR THE MITCHELL PARK SOUTH RESOURCE LIBRARY PROJECT
Revision Date: 6/27/2006
ONE-YEAR REVIEW OF CITY SUSTAINABILITY PROGRAM ACCOMPLISHMENTS AND RECOMMENDATION TO REVISE CITYWIDE SUSTAINABILITY POLICY
Revision Date: 6/27/2006
INITIAL REVIEW OF FINAL ENVIRONMENTAL IMPACT REPORT REGARDING CONCEPTUAL DESIGNS FOR THE MAIN LIBRARY AND THE ART CENTER EXPANSION PROJECTS
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT IN THE AMOUNT OF $15,714 TO EXISTING CONTRACT FOR EMPLOYEE TRAINING WITH FOOTHILL DEANZA BUSINESS AND INDUSTRY INSTITUTE, CHANGING CONTRACT AMOUNT FROM $119,286 TO $135,000 FOR THE SECOND CONTRACT YEAR
Revision Date: 6/27/2006
APPROVAL OF RESOLUTION TO ENTER INTO A JOINT POWERS AGREEMENT WITH INTERGOVERNMENTAL EMPLOYEE RELATIONS SERVICE
Revision Date: 6/27/2006
ANNUAL ADOPTION OF THE CITY’S INVESTMENT POLICY
Revision Date: 6/27/2006
AGREEMENTS BETWEEN THE CITY OF PALO ALTO AND THE CITIES OF EAST PALO ALTO, LOS ALTOS, AND LOS ALTOS HILLS FOR INFORMATION TECHNOLOGY SERVICES
Revision Date: 6/27/2006
ADOPTION OF FINAL APPROPRIATION LIMIT CALCULATION RESOLUTION FOR 2002-03
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT IN THE AMOUNT OF $27,300 FOR A TOTAL CONTRACT AMOUNT OF $92,300 FOR CONSULTING SERVICES CONTRACT S2140446 WITH DAVID POWERS AND ASSOCIATES TO COMPLETE AN ENVIRONMENTAL IMPACT REPORT FOR THE EDGEWOOD REDEVELOPMENT PROJECT AREA
Revision Date: 6/27/2006
APPROVAL OF SOFTWARE SUPPORT SERVICES CONTRACT RENEWALS WITH ORACLE CORPORATION IN THE AMOUNT OF $342,285 (3 YEARS AT $114,095 PER YEAR)
Revision Date: 6/27/2006
PRESENTATION ON COMMUNITY SURVEY AND OPTIONS FOR CITY COUNCIL CONSIDERATION IN RESPONSE TO RESULTS OF SECOND COMMUNITY SURVEY ON LIBRARY AND OTHER COMMUNITY FACILITIES BOND MEASURE
Revision Date: 6/27/2006
APPROVAL OF AGREEMENT BETWEEN CITY AND PALO ALTO UNIFIED SCHOOL DISTRICT FOR DEVELOPMENT OF EVERYONE’S HOMEWORK AND ENRICHMENT CENTER IN THE PROPOSED SOUTH RESOURCE LIBRARY AT MITCHELL PARK
Revision Date: 6/27/2006
REJECTION OF BIDS RECEIVED ON MAY 21, 2002 FOR WATERGAS-WASTEWATER SERVICE INSTALLATION PROJECT
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT NUMBER 2 TO CONTRACT NUMBER C2138656 TO INCREASE THE CONTRACT AMOUNT WITH FLYNN AND ASSOCIATES FOR ELECTRIC REGULATORY AND TECHNICAL ASSISTANCE BY $75,000 FOR FISCAL YEAR 2002-03 AND APPROVAL OF AGREEMENT WITH THE CITY OF ALAMEDA DOING BUSINESS AS POWER AND TELECOM FOR REIMBURSEMENT OF COSTS IN FISCAL YEAR 2001-02 AND FISCAL YEAR 2002-03
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT NUMBER TWO TO THE DELOITTE AND TOUCHE CONTRACT C9115650 FOR RISK MANAGEMENT SERVICES TO INCREASE THE FUNDING IN THE AMOUNT OF $300,000 FOR A TOTAL MAXIMUM COMPENSATION OF $740,000 TO CONTINUE ASSISTANCE IN IMPLEMENTING AN ENERGY RISK MANAGEMENT PROGRAM
Revision Date: 6/27/2006
RESOLUTION CERTIFYING ADOPTION OF MITIGATED NEGATIVE DECLARATION AND APPROVAL OF CONCEPTUAL DESIGN OF THE MITCHELL PARK LIBRARY AND COMMUNITY CENTER PROJECT
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH ST. FRANCIS ELECTRIC IN THE AMOUNT OF $269,915 FOR CONSTRUCTION OF DOWNTOWN STREET LIGHTING IMPROVEMENTS
Revision Date: 6/27/2006
ANNUAL REPORT ON THE PROGRESS OF THE LONG-TERM GOALS FOR THE PALO ALTO REGIONAL WATER QUALITY CONTROL PLANT
Revision Date: 6/27/2006
ADOPTION OF THE 2002-03 BUDGET AND APPROVAL OF A BUDGET ADOPTION ORDINANCE, INCLUDING THE 2002-03 CAPITAL IMPROVEMENT PROGRAM, CHANGES TO THE MUNICIPAL FEE SCHEDULE, UTILITY RATES AND CHARGES, AND CHANGES TO COMPENSATION PLANS
Revision Date: 6/27/2006
TIMELY STAFF REPORTS
Revision Date: 6/27/2006
ADOPTION OF REGULATIONS RE PUBLIC USE OF CITY PARKS AND OPEN SPACE FACILITIES
Revision Date: 6/27/2006
AGREEMENT WITH SKYHAWKS SPORTS ACADEMY FOR RECREATION YOUTH SPORTS CONTRACT CAMPS
Revision Date: 6/27/2006
AWARD OF CONTRACT IN THE AMOUNT OF $84,231 TO GACHINA LANDSCAPE MANAGEMENT FOR BYXBEE PARK VEGETATION MANAGEMENT
Revision Date: 6/27/2006
APPROVAL OF AN AGREEMENT IN THE AMOUNT OF $75,000 WITH THE PALO ALTO HOUSING CORPORATION FOR ADMINISTRATION AND CONSULTING SERVICES FOR THE BELOW MARKET RATE HOUSING PROGRAM FOR FISCAL YEAR 2002 - 2003
Revision Date: 6/27/2006
PALO ALTO REDEVELOPMENT AGENCY ANNUAL FISCAL YEAR 2001-02 AND 2002-03 BUDGET ADOPTION
Revision Date: 6/27/2006
ADDITIONAL INFORMATION ON OPTIONS FOR COUNCIL ACTION BASED UPON RESULTS OF SECOND COMMUNITY SURVEY
Revision Date: 6/27/2006
APPROVAL OF A RESOLUTION TO REVISE THE CITY OF PALO ALTO LANDSCAPE WATER EFFICIENCY STANDARDS
Revision Date: 6/27/2006
REQUEST TO AUTHORIZE THE CITY MANAGER TO EXECUTE REPLACEMENT AGREEMENTS RELATED TO ELECTRIC TRANSMISSION INTERCONNECTION SERVICES
Revision Date: 6/27/2006
RESOLUTION APPROVING MITIGATED NEGATIVE DECLARATION AND CONCEPTUAL DESIGN OF THE CHILDREN’S LIBRARY EXPANSION PROJECT
Revision Date: 6/27/2006
RESOLUTIONS APPROVING INSTALLATION OF NEW MIDBLOCK CROSSWALK ON CHANNING AVENUE BETWEEN BRYANT AND WAVERLEY STREETS AND REMOVING AN EXISTING MID-BLOCK CROSSWALK ON HOMER AVENUE BETWEEN BRYANT AND WAVERLEY STREETS
Revision Date: 6/27/2006
APPROVAL OF AGREEMENT WITH SAFETY-KLEEN (SAN JOSE), INC., IN THE AMOUNT OF $420,000 PER YEAR, WITH AN OPTION TO RENEW FOR TWO ADDITIONAL YEARS, FOR HOUSEHOLD AND CONDITIONALLY EXEMPT SMALL QUANTITY GENERATOR HAZARDOUS WASTE MANAGEMENT PROGRAM SERVICES
Revision Date: 6/27/2006
STATUS OF AT&T/COMCAST TRANSFER OF OWNERSHIP PROCESS
Revision Date: 6/27/2006
APPROVAL OF PROFESSIONAL SERVICES AGREEMENT WITH GEODESY IN THE AMOUNT OF $102,000 FOR DEVELOPMENT SUPPORT OF NEW COMPUTER APPLICATIONS LINKED TO THE GEOGRAPHIC INFORMATION SYSTEM (GIS)
Revision Date: 6/27/2006
RESOLUTION CERTIFYING FINAL ENVIRONMENTAL IMPACT REPORT FOR THE NEWELL/EMBARCADERO CIVIC FACILITIES EXPANSION PROGRAM AND RESOLUTION APPROVING CONCEPTUAL DESIGN FOR THE ART CENTER EXPANSION PROJECT
Revision Date: 6/27/2006
ADOPTION OF A RESOLUTION REVISING RATE SCHEDULE C-4 TO EXPAND PARTICIPATION IN THE UTILITIES RESIDENTIAL RATE ASSISTANCE PROGRAM TO LOW-INCOME HOUSING
Revision Date: 6/27/2006
RESOLUTION DETERMINING THAT THE PUBLIC INTEREST AND NECESSITY REQUIRE THE ACQUISITION OF CONSTRUCTION EASEMENTS AT 525 ALMA STREET AND 542 HIGH STREET FOR THE DOWNTOWN PARKING STRUCTURES (CIP 19530)
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH PULSAR TECHNOLOGIES, INC. IN THE AMOUNT OF $181,837 FOR SUBSTATION FIBER OPTIC COMMUNICATION NETWORK
Revision Date: 6/27/2006
HUMAN RELATIONS COMMISSION PROPOSED RECOMMENDATION TO THE CITY COUNCIL TO ADOPT A RESOLUTION IN SUPPORT OF THE CONVENTION ON THE ELIMINATION OF ALL FORMS OF DISCRIMINATION (CEDAW)
Revision Date: 6/27/2006
AWARD OF CONTRACT TO VON KOHORN & KITZMILLER IN THE AMOUNT OF $100,690 FOR GRAPHICS AND SIGNAGE FOR THE DOWNTOWN PARKING STRUCTURES (CAPITAL IMPROVEMENT PROGRAM PROJECT 19530)
Revision Date: 6/27/2006
REPORT ON SCHEDULE AND FUNDING STATUS OF HOMER AVENUE CALTRAIN UNDERCROSSING, CAPITAL IMPROVEMENT PROGRAM PROJECT 10121; AND ADOPTION OF A RESOLUTION AUTHORIZING THE FILING OF A GRANT APPLICATION FOR FEDERAL SURFACE TRANSPORTATION FUNDS THROUGH THE METROPOLITAN TRANSPORTATION COMMISSION'S TRANSPORTATION FOR LIVABLE COMMUNITIES PROGRAM FOR THE PROJECT AND COMMITING THE NECESSARY LOCAL MATCH AND STATING THE ASSURANCE OF THE CITY OF PALO ALTO TO COMPLETE THE PROJECT
Revision Date: 6/27/2006
INFORMATION REGARDING THE SELECTION OF THE OPTION SELECTED FOR SCHEMATIC DESIGN AT THE CIVIC CENTER SITE FOR THE PUBLIC SAFETY BUILDING
Revision Date: 6/27/2006
BALLOT MEASURE AND LEGISLATIVE ADVOCACY PROCESS
Revision Date: 6/27/2006
PUBLIC HEARING: WEED ABATEMENT CHARGES
Revision Date: 6/27/2006
REVIEW AND COMMENT ON THE PROPOSED SANTA CLARA COUNTY DISTRICT TEXT FOR THE STANFORD OPEN SPACE/ FIELD RESEARCH (OS/F) ZONING DISTRICT TO IMPLEMENT THE 2000 STANFORD COMMUNITY PLAN
Revision Date: 6/27/2006
525 SAN ANTONIO ROAD: REVIEW OF AN APPLICATION FOR A TENTATIVE MAP TO SUBDIVIDE A 2.64-ACRE SITE INTO 10 SINGLE FAMILY LOTS
Revision Date: 6/27/2006
APPROVAL OF RESOLUTIONS AMENDING COMPENSATION PLAN FOR MANAGEMENT, CONFIDENTIAL AND HOURLY PERSONNEL, AND AMENDING THE MERIT SYSTEM RULES AND REGULATIONS
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH J.J.R. CONSTRUCTION, INC. IN THE AMOUNT OF $895,000 FOR FISCAL YEAR 2002-03 PHASE 1 SIDEWALK REPLACEMENT PROJECT
Revision Date: 6/27/2006
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING CHAPTER 16.09 OF THE PALO ALTO MUNICIPAL CODE TO REDUCE DISCHARGES OF POLLUTANTS TO THE SANITARY SEWER AND STORM DRAINAGE SYSTEMS
Revision Date: 6/27/2006
PALO ALTO COMMUNITY FACILITIES BOND PACKAGE AND COST ADVISORY COMMITTEE REPORT
Revision Date: 6/27/2006
SUNNYVALE MATERIALS RECOVERY AND TRANSFER STATION ANNUAL REPORT
Revision Date: 6/27/2006
ADOPTION OF A RESOLUTION APPROVING A TRANSFER OF CONTROL OF THE EXISTING CABLE FRANCHISE AND SYSTEM HELD BY TCI CABLEVISION OF CALIFORNIA, INC., DOING BUSINESS AS AT&T BROADBAND, FROM AT&T CORPORATION TO AT&T COMCAST CORPORATION
Revision Date: 6/27/2006
REQUEST FOR APPROVAL OF AGREEMENT BETWEEN THE CITY OF PALO ALTO ON BEHALF OF THE JOINT POWERS AND MIDPENINSULA COMMUNITY MEDIA CENTER, INC. AND AGREEMENT BETWEEN THE CITY OF PALO ALTO AND MIDPENINSULA COMMUNITY MEDIA CENTER, INC. IN THE AMOUNT OF $160,000
Revision Date: 6/27/2006
FOLLOW-UP STUDY ON DEVELOPMENT IMPACT FEES
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH GACHINA LANDSCAPE MANAGEMENT IN THE AMOUNT OF $262,387 FOR CUBBERLEY COMMUNITY CENTER LANDSCAPE MAINTENANCE
Revision Date: 6/27/2006
APPROVAL OF THE NATURAL GAS SERVICES AGREEMENT WITH PACIFIC GAS AND ELECTRIC ENERGY TRADING GAS CORPORATION FOR AN AMOUNT NOT TO EXCEED $10.9 MILLION FOR NATURAL GAS OPERATIONS AND RESIDUAL GAS BALANCING SERVICES
Revision Date: 6/27/2006
ADOPTION OF RESOLUTION AND FIRST READING OF ORDINANCE NECESSARY FOR THE DEVELOPMENT AND BOND FINANCING OF COMMUNITY FACILITY IMPROVEMENTS
Revision Date: 6/27/2006
423 KIPLING STREET: RECOMMENDATION FROM THE HISTORIC RESOURCES BOARD AT THE REQUEST OF THE OWNERS, THE ORWITZ FAMILY, TO RECLASSIFY A CATEGORY 3 BUILDING ON THE CITY OF PALO ALTO'S HISTORIC INVENTORY TO CATEGORY 2 PURSUANT TO MUNICIPAL CODE CHAPTER 16.49 (HISTORIC PRESERVATION ORDINANCE)
Revision Date: 6/27/2006
APPROVAL OF EXPENDITURE OF ASSET SEIZURE FUNDS IN THE AMOUNT OF $26,000 FOR THE PURCHASE OF GAS MASKS
Revision Date: 6/27/2006
AWARD OF CONTRACT TO WATERPROOFING ASSOCIATES IN THE AMOUNT OF $126,678 FOR THE REPAIR AND REPLACEMENT OF ROOFING FOR THE WATER QUALITY CONTROL PLANT
Revision Date: 6/27/2006
PARK IMPROVEMENT ORDINANCE FOR IMPROVEMENTS TO THE MEMORIAL GROVE AT ELEANOR PARDEE PARK
Revision Date: 6/27/2006
COMPLAINTS MADE BY MEMBERS OF THE PUBLIC TO THE POLICE DEPARTMENT, FIRST AND SECOND QUARTER OF 2002
Revision Date: 6/27/2006
APPROVAL OF RENEWAL OF AN AGREEMENT WITH ACTERRA FOR STEWARDSHIP OF THE ARASTRADERO PRESERVE
Revision Date: 6/27/2006
MEMORANDUM OF UNDERSTANDING WITH ART CENTER FOUNDATION TO CREATE THE ART CENTER CHALLENGE GRANT PROGRAM
Revision Date: 6/27/2006
STUDY SESSION ON CALTRANS/EL CAMINO REAL MASTER SCHEMATIC DESIGN PLAN PROJECT
Revision Date: 6/27/2006
AWARD OF CONTRACT TO CUPERTINO ELECTRIC INC. IN THE AMOUNT OF $499,782 FOR THE EMERGENCY GENERATOR REPLACEMENTS AND ELECTRICAL UPGRADES AT FIRE STATIONS 1-5, STATION 8, AND THE MUNICIPAL SERVICE CENTER – CAPITAL IMPROVEMENT PROGRAM PROJECTS 19707, 10005 AND 10103
Revision Date: 6/27/2006
APPROVAL OF RESOLUTION ESTABLISHING NO PARKING ZONES ON ALMA STREET NORTH OF LYTTON AVENUE, AND ON LYTTON AVENUE EAST OF ALMA STREET
Revision Date: 6/27/2006
CITY OF PALO ALTO'S INVESTMENT ACTIVITY REPORT FOR THE FOURTH QUARTER, FISCAL YEAR 2001-02
Revision Date: 6/27/2006
INCREASED PARKING IN-LIEU FEE
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH W. BRADLEY ELECTRIC IN THE AMOUNT OF $157,000 FOR MODIFYING THE TRAFFIC SIGNAL AT MIDDLEFIELD ROAD AND MEADOW DRIVE, AND APPROVAL OF A RESOLUTION PROHIBITING PARKING ON MEADOW DRIVE
Revision Date: 6/27/2006
151 LAURA LANE: SITE AND DESIGN REVIEW FOR A NEW PUBLIC ACCESSIBLE PEDESTRIAN PATHWAY CONNECTING THE INTERNATIONAL SCHOOL AND THE BAYLANDS ATHLETIC CENTER'S PARKING LOT [02-D-01, 02-ARB-36] AND APPROVAL OF LICENSE AGREEMENT
Revision Date: 6/27/2006
APPROVAL OF CONTRACT WITH GEOFF BROSSEAU IN THE AMOUNT OF $125,000 TO PROVIDE ASSISTANCE WITH THE POLLUTION PREVENTION PRO
Revision Date: 6/27/2006
RESOLUTION AUTHORIZING THE CITY OF PALO ALTO TO SUBMIT A FUNDING APPLICATION IN THE AMOUNT OF $150,000 TO THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT (BAAQMD) FOR THE PURCHASE OF THREE COMPRESSED NATURAL GAS TRUCKS AND AUTHORIZING THE CITY MANAGER TO EXECUTE A FUNDING AGREEMENT WITH THE BAAQMD IF THE APPLICATION IS APPROVED BY THE BAAQMD BOARD OF DIRECTORS
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT TO CONTRACT #C2133010 BETWEEN THE CITY OF PALO ALTO AND THE CITY OF INGLEWOOD TO INCREASE THE CONTRACT AUTHORITY FOR PARKING CITATION PROCESSING SERVICES FOR THE FIRST YEAR BY $22,600 AND TO SET THE AMOUNT OF THE CONTRACT FOR EACH SUBSEQUENT YEAR OF THE AGREEMENT IN AN AMOUNT NOT TO EXCEED $55,000
Revision Date: 6/27/2006
COUNCIL APPROVAL OF AN AGREEMENT AMONG THE CITY OF PALO ALTO, THE HOUSING AUTHORITY OF THE COUNTY OF SANTA CLARA, AND THE COMMUNITY WORKING GROUP PROVIDING $1,280,000 IN COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS FOR PRE-DEVELOPMENT, SITE ACQUISITION, AND PRE-CONSTRUCTION EXPENSES FOR THE OPPORTUNITY CENTER FOR THE MID-PENNINSULA PROJECT ON ENCINA AVENUE
Revision Date: 6/27/2006
REQUEST OF PROPERTY OWNERS OF A PORTION OF TRACT 796 FOR REZONING FROM R-1 SINGLE FAMILY RESIDENTIAL TO R-1 (S) SINGLE STORY OVERLAY DISTRICT IN THE GREER PARK NEIGHBORHOOD (VAN AUKEN CIRCLE AND PORTIONS OF GREER ROAD AND AMARILLO AVENUE)
Revision Date: 6/27/2006
RESOLUTION ADOPTING THE SANTA CLARA COUNTY GREEN BUSINESS PLEDGE
Revision Date: 6/27/2006
RECOMMENDATION TO SELECT EDEN HOUSING, INC AS THE DEVELOPER OF AN AFFORDABLE RENTAL HOUSING PROJECT ON A SITE TO BE SELECTED
Revision Date: 6/27/2006
APPROVAL OF FOUR CONTRACTS TOTALING $4,062,879 ASSOCIATED WITH THE IMPLEMENTATION OF THE ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM
Revision Date: 6/27/2006
1421-1423 EMERSON STREET - SUMMARY VACATION OF PUBLIC UTILITY EASEMENT
Revision Date: 6/27/2006
DISCUSSION OF CHANGES TO CMR:343:02; APPROVAL OF RESOLUTION ESTABLISHING NO PARKING ZONES ON ALMA STREET NORTH OF LYTTON AVENUE, AND ON LYTTON AVENUE EAST OF ALMA STREET
Revision Date: 6/27/2006
APPROVAL OF MEMORANDUM OF UNDERSTANDING WITH SANTA CLARA VALLEY WATER DISTRICT (SCVWD) TO IMPLEMENT A WATER CONSERVATION PROGRAM PARTNERSHIP IN THE AMOUNT OF $106,480
Revision Date: 6/27/2006
TOP 5 QUARTERLY REPORT
Revision Date: 6/27/2006
AWARD OF CONTRACT IN THE AMOUNT OF $825,312 TO NOVO CONSTRUCTION FOR THE ELECTRICAL AND MECHANICAL UPGRADE TO THE COMPUTER AND POLICE COMMUNICATIONS EQUIPMENT ROOM - CAPITAL IMPROVEMENT PROGRAM (CIP) PROJECT 10027 AND CIVIC CENTER INFRASTRUCTURE UPGRADES - CIP PROJECT 10102
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH RIVER CITY CONSTRUCTORS IN THE AMOUNT OF $163,234 FOR TRAFFIC CONTROL SAFETY DEVICES, CAPITAL IMPROVEMENT PROGRAM PROJECT 19704
Revision Date: 6/27/2006
FRIENDS OF THE LIBRARY BOOK SALES LOCATION
Revision Date: 6/27/2006
UPDATE ON STAFF EFFORTS TO ADDRESS RESIDENTS' CONCERNS REGARDING TRAIN HORN NOISE
Revision Date: 6/27/2006
RESOLUTION TO INSTALL STOP SIGNS ON ILIMA WAY AND ILIMA COURT AT LAGUNA AVENUE
Revision Date: 6/27/2006
AWARD OF CONTRACT TO TRUGREEN LANDCARE IN AN AMOUNT NOT TO EXCEED $125,000 FOR FISCAL YEAR 2002 - 2003 STUMP REMOVAL PROJECT
Revision Date: 6/27/2006
PLANNING AND TRANSPORTATION COMISSION RECOMMENDATION TO THE CITY COUNCIL TO ADOPT A RESOLUTION APPROVING NO PARKING ZONES ON ARASTRADERO ROAD AT TERMAN DRIVE
Revision Date: 6/27/2006
PROCEDURE FOR BOARD AND COMMISSION MINUTES
Revision Date: 6/27/2006
151 LAURA LANE: SITE AND DESIGN REVIEW FOR A NEW PUBLIC ACCESSIBLE PEDESTRIAN PATHWAY CONNECTING THE INTERNATIONAL SCHOOL AND THE BAYLANDS ATHLETIC CENTER'S PARKING LOT [02-D-01, 02-ARB-36] AND APPROVAL OF LICENSE AGREEMENT
Revision Date: 6/27/2006
APPROVAL OF A GRANT REQUEST TO THE STATE OF CALIFORNIA TO PARTIALLY FUND BATTERY BACKUP SYSTEMS FOR INTERSECTIONS WITH LIGHT EMITTING DIODE (LED) TRAFFIC SIGNALS
Revision Date: 6/27/2006
APPROVAL OF AWARD OF CONTRACT IN THE AMOUNT OF $197,133 TO ALL CITY MANAGEMENT SERVICES, INC. FOR ADULT CROSSING GUARD SERVICES AND AUTHORIZATION FOR CONTRACT EXTENSIONS FOR TWO ADDITIONAL YEARS
Revision Date: 6/27/2006
APPROVAL OF AMENDMENT NO. 3 TO THE CONTRACT WITH DILLINGHAM ASSOCIATES IN THE AMOUNT OF $83,320 FOR SERVICES ASSOCIATED WITH DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS FOR PHASE 2 OF THE MITCHELL PARK FACILITIES IMPROVEMENTS (CIP 19803)
Revision Date: 6/27/2006
REQUEST FOR COUNCIL DIRECTION REGARDING ISSUING A REQUEST FOR PROPOSAL TO RELOCATE, REPAIR AND LEASE THE FORMER SEA SCOUT FACILITY AT 2560 EMBARCADERO ROAD
Revision Date: 6/27/2006
FISCAL YEAR 2002-03 CONSULTANT AGREEMENTS GREATER THAN $65,000
Revision Date: 6/27/2006
AGREEMENT BETWEEN THE CITY OF PALO ALTO AND THE TOWN OF ATHERTON FOR INFORMATION TECHNOLOGY SERVICES
Revision Date: 6/27/2006
RECOMMENDATION TO: ESTABLISH A BELOW MARKET RATE (BMR) PROGRAM EMERGENCY FUND TO PREVENT THE LOSS OF BMR UNITS, AND PROVIDE EMERGENCY LOANS FOR BMR UNIT OWNERS FOR SUBSTANTIAL MANDATORY ASSESSMENTS, AND APPROVAL OF LOAN PROGRAM CRITERIA AND LOAN TERMS; ADOPTION OF A BUDGET AMENDMENT ORDINANCE TO APPROPRIATE $150,000 FROM THE RESIDENTIAL HOUSING IN-LIEU FUND TO THE NEW BMR EMERGENCY FUND; AUTHORIZATION TO THE CITY MANAGER TO APPLY FOR A HOUSING ENABLED BY LOCAL PARTNERSHIPS (HELP) LOAN TO ASSIST IN FUNDING THIS PROGRAM; AND DIRECTION TO THE CITY MANAGER TO DEVELOP AND IMPLEMENT AN ASSIGNMENT FEE CHARGE ON THE RESALE PRICE OF BMR UNITS
Revision Date: 6/27/2006
ORDINANCE FOR FOLLOW-UP ITEMS ON DEVELOPMENT IMPACT FEES
Revision Date: 6/27/2006
APPROVAL OF A CONTRACT WITH NORTHWEST WOODLAND SERVICES, INC. IN AN AMOUNT NOT TO EXCEED $118,890 FOR ARASTRADERO PRESERVE TRAIL IMPROVEMENTS AND INSTALLATION OF FIXTURES
Revision Date: 6/27/2006
ORDINANCE ADOPTING THE 2001 CALIFORNIA FIRE CODE WITH LOCAL AMENDMENTS; MAKING CERTAIN FINDINGS; AND SETTING A PUBLIC HEARING FOR OCTOBER 15, 2002
Revision Date: 6/27/2006
CHANGE IN USE OF CITIZENS OPTIONS FOR PUBLIC SAFETY (COPS) FUNDS
Revision Date: 6/27/2006
CHANGE ORDER TO INCREASE EXISTING CONTRACT (S2140631) WITH PACIFIC GAS AND ELECTRIC COMPANY IN THE AMOUNT OF $50,000 FOR ADDITIONAL TRAINING AND TRAINING CONSULTING SERVICES MANDATED BY THE U.S. DEPARTMENT OF TRANSPORTATION OPERATOR QUALIFICATION COMPLIANCE
Revision Date: 6/27/2006
ZONING TEXT AMENDMENT TO PAMC SECTION 18.88.160 (VEHICLE AND EQUIPMENT REPAIR AND STORAGE) TO RESTRICT STORAGE OF VEHICLES ON UNPAVED SURFACES, VISIBILITY TRIANGLES, AND FRONT YARDS AND TO RESTRICT HOURS FOR OUTDOOR SCREENED VEHICLE REPAIR IN RESIDENTIAL ZONES
Revision Date: 6/27/2006
APPROVAL OF A CLOSED END MOTOR VEHICLE LEASE AGREEMENT IN THE AMOUNT OF $126,311 WITH SAN FRANCISCO TOYOTA FOR THE LEASE OF FIVE TOYOTA RAV-4 ELECTRIC VEHICLES
Revision Date: 6/27/2006
COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS
Revision Date: 6/27/2006
STATUS REPORT ON ZONING ORDINANCE UPDATE
Revision Date: 6/27/2006
ACCEPTANCE OF LOCAL LAW ENFORCEMENT BLOCK GRANT (LLEBG) FUNDS IN THE AMOUNT OF $17,150
Revision Date: 6/27/2006
APPROVAL TO JOIN THE CALIFORNIA FUEL CELL PARTNERSHIP AT THE ASSOCIATE PARTNER LEVEL IN ORDER FOR THE CITY OF PALO ALTO TO HOST A TEST AND DEMONSTRATION HYDROGEN FUELING STATION
Revision Date: 6/27/2006
UTILITIES ADVISORY COMMISSION RECOMMENDATION ON TRINITY RIVER RESTORATION LITIGATION AND SCHEDULING THE COUNCIL’S CONSIDERATION OF THIS ISSUE
Revision Date: 6/27/2006
REQUEST FOR THE APPROVAL OF ELECTRIC PORTFOLIO PLANNING GUIDELINES FOR THE LONG-TERM ELECTRIC ACQUISITION PLAN (LEAP)
Revision Date: 6/27/2006
ENERGY RISK MANAGEMENT POLICIES
Revision Date: 6/27/2006
SUBJECT: ADOPTION OF RESOLUTION REQUIRED FOR THE HOUSING ENABLED BY LOCAL PARTNERSHIP (HELP) PROGRAM LOAN APPLICATION
Revision Date: 6/27/2006
APPROVAL OF CONTRACT EXTENSION AND INCREASE IN THE EXPENDITURE LIMIT OF THE RAIL SHUTTLE BUS SERVICE ADMINISTRATION AGREEMENT WITH THE PENINSULA CORRIDOR JOINT POWERS BOARD FOR THE PALO ALTO SHUTTLE PROJECT
Revision Date: 6/27/2006
Acceptance of Annual Status Report on Developers' Fees
Revision Date: 6/27/2006
Request for Council Consideration of Development Fee and Mitigation Policy and Request to Schedule a Noticed Public Meeting on a Resolution of the Council of the City of Palo Alto Declaring Council Policy to Mitigate Development Impacts and Initiating Proceedings to Establish Development Impact Fees for Parks, Community Centers and Libraries
Revision Date: 6/27/2006
Request for Authorization to Increase the Amount of the Existing Contract for Legal Services with the Law Firm of Ellman Burke Hoffman & Johnson
Revision Date: 6/27/2006