291:01 Conceptual approval to proceed with conceptual design for expansion/modernization of the current police building Revision Date: 6/27/2006
293:01 Award of contract to Monterey Mechanical Co., Inc. in the amount of $97,500 for the sedimentation tank sludge transfer system for the water quality control plant (Wastewater Treatment Capital Improvement Program Project 9805) Revision Date: 6/27/2006
295:01 Public Hearing: Weed abatement charges Revision Date: 6/27/2006
296:01 Approval of a contract with Sposeto Engineering, Inc. in the amount of $1,074,596 for Fiscal Year 2001-02 Phase 1 Sidewalk Replacement Project Revision Date: 6/27/2006
297:01 Implementation of an environmental services center and initiate sale of the former Los Altos Treatment Plant site Revision Date: 6/27/2006
298:01 Approval of consultant contract with Nolte Associates, Inc. in the amount of $157,102 for design services for the Homer Avenue Caltrain undercrossing, Capital Improvement Program Project 10121 Revision Date: 6/27/2006
299:01 Award of a contract to Blymyer Engineers, Inc. in the amount of $148,900 for the design of an integrated fueling facility and public compressed natural gas fueling dispenser at the Municipal Services Center Revision Date: 6/27/2006
300:01 Request to delay consideration of the Children's Theatre staffing recommendation Revision Date: 6/27/2006
301:01 Approval of expenditure of asset seizure funds in the amount of $36,500 Revision Date: 6/27/2006
303:01 Complaints made by members of the public to the Police Department Revision Date: 6/27/2006
304:01 Progress update on Council direction regarding Ventura Site Revision Date: 6/27/2006
306:01 Ordinance of the Council of the City of Palo Alto declaring the need for a redevelopment agency to function in the City and declaring the Council to be the redevelopment agency for the City of Palo Alto Revision Date: 6/27/2006
307:01 Fiscal Years 2001-02 and 2002-03 consultant agreements Revision Date: 6/27/2006
308:01 Approval of contract with Keyser Marston Associates, Inc. in the amount of $76,000 for plan adoption feasibility services regarding the formation of a redevelopment agency Revision Date: 6/27/2006
309:01 City of Palo Alto's Investment Activity Report for the Fourth Quarter, Fiscal Year 2001-01 Revision Date: 6/27/2006
310:01 Approval of a resolution declaring intention to reimburse expenditures related to capital projects from the proceeds of bonds to be issued by the City for water and gas fund capital improvements Revision Date: 6/27/2006
311:01 Approval of a Budget Amendment Ordinance amending the 2001-02 Municipal Fee Schedule to correct for an omitted fee change Revision Date: 6/27/2006
315:01 Approval of contract in the amount of $1,898,747 with Utility Constructors for providing overhead and underground construction services with options for $3,891,490 Revision Date: 6/27/2006
317:01 Approval of amendments to Palo Alto Municipal Code Chapter 9.10 restricting construction, demolition and repair activities and modifying the hours for public street sweeping and parking lot cleaning Revision Date: 6/27/2006
318:01 Approval of contract in the amount of $212,160 to Midwest Industrial Supply, Inc. for the Arastradero Utility All Weather Access Road CIP Project 0118 and adoption of park improvement ordinances in Arastradero Preserve and Foothills Park Revision Date: 6/27/2006
319:01 Approval of a contract between the City of Palo Alto and the Palo Alto Art Center Foundation in an amount not to exceed $100,00 to conduct spatial and feasibility studies of the Art Center and Main Library Site Revision Date: 6/27/2006
320:01 Approval of a contracts with Navigant Consulting for electric regulatory and technical consulting and gas regulatory and technical consulting for $180,000 for fiscal year 2001-02 with options for $320,000 for fiscal years 2002-03 and 2003-04 Revision Date: 6/27/2006
322:01 Approval of ordinance amending Chapter 10.64 regulating bicycles and resolution reducing bicycle violation fines Revision Date: 6/27/2006
324:01 Approval for amendment to contract amount by $15,000 for background investigations Revision Date: 6/27/2006
325:01 Award of Open Purchase Contract to McNevin Cleaning Specialist, Inc. in the Amount of $120,000 to provide carpet, upholstery and window covering cleaning at City facilities Revision Date: 6/27/2006
326:01 Resolution adopting a change to the fees for dark fiber licensing Revision Date: 6/27/2006
327:01 Approval of contract with Architectural Resources Group in the amount of $134,385 for preliminary architectural design services for the Children's Library Expansion, Capital Improvement Project 10204 Revision Date: 6/27/2006
329:01 Approval of open purchase contracts with Carl and Manor Advertising in the amount of $100,000 for graphic design Revision Date: 6/27/2006
331:01 Approval of a contract in an amount not to exceed $100,000 with Landfirst Consultants, Inc. for removal of surplus green waste from the Palo Alto Composting Facility to Alternate Recycling Facilities Revision Date: 6/27/2006
334:01 New land development review permit provisions proposed as part of National Pollutant Discharge Elimination System Storm Water Discharge Permit Renewal Revision Date: 6/27/2006
335:01 2051 El Camino Real [01-D-5, 01-V-9, 01-DEE-1]: Request by Carrasco & Associates and Mehmood Taqui on behalf of Joe and Evelyn Bradford for site and design review of a new three-story, mixed-use building to contain ground floor retail, second floor office and second and third floor residential uses in the CN District Revision Date: 6/27/2006
336:01 Approval of a loan from Community Develoment Block Grant (CDBG) Funds to the Palo Alto Housing Corporation for rehabilitation costs of the Emerson North Apartments at 3051-3061 Emerson Street Revision Date: 6/27/2006
338:01 Adoption of an ordinance for a Single Family Individual Review Process and an ordinance amending the Single Family (R-1) Development Regulations Revision Date: 6/27/2006
339:01 Status Report on request by the Below Market Rate (BMR) Homeowners at the Palo Alto Redwoods for assistance with a special assessment Revision Date: 6/27/2006
341:01 Resolution authorizing the City to transact with British Petroleum Energy Company Revision Date: 6/27/2006
342:01 Endorsement of Long-Term Goals for the Palo Alto Regional Water Quality Control Plant (RWQCP) Revision Date: 6/27/2006
343:01 Recommendation to adopt Integrated Pest Management Policy Revision Date: 6/27/2006
344:01 Four-Party memorandum of understanding to resolve middle school challenge Revision Date: 6/27/2006
345:01 Award of contract in an amount not to exceed $250,000 to Asplundh Tree Expert Company for Fiscal Year 2001-2002 Tree Maintenance Project Revision Date: 6/27/2006
349:01 Acceptance of Local Law Enforcement Block Grant (LLEBG) Funds in the amount of $23,218 Revision Date: 6/27/2006
350:01 Quarterly Report on Demographic Data Collection (Profiling) Revision Date: 6/27/2006
351:01 Approval of Professional Services Agreement with Geodesy for development support of new computer applications linked to the GIS Revision Date: 6/27/2006
352:01 Recommendation to support the implementation of San Francisquito Creek Joint Powers Authority's Levee Restoration Project Revision Date: 6/27/2006
353:01 Approval of consultant contract with TJKM in the amount of $74,809 for provision of a Citywide Travel Demand Model (RFP# 136950) Revision Date: 6/27/2006
353:01 City Awarded $680,000 Grant for City Facilities Lighting Retrofit Project Revision Date: 6/27/2006
354:01 Request approval of a budget amendment ordinance for Fiscal Year 2001-02 in the amount of $200,000 for Capital Improvement Project 10204, Library Master Plan; amending the budget for Fiscal Year 2001-02 in the amount of $105,444 in associated operating expenses; adding one full-time position in the Public Works department; and the Process and Schedule to accelerate the New Library Plan Revision Date: 6/27/2006
355:01 Update to Long Range Financial Plan Revision Date: 6/27/2006
356:01 539 Alma Street: Designation to the Historic Inventory of a significant building in category 2 at the request of the owner, Steven L. Fasani, pursuant to Municipal Code Chapter 16.49, Sections 16.49.020 and 16.49.040 Revision Date: 6/27/2006
358:01 Approval of a contract between the City of Palo Alto and Trees for El Camino Project in the amount of $78,000 to conduct a fundraising program for an enhanced tree planting program along the El Camino Real Corridor Revision Date: 6/27/2006
360:01 Approval of Budget Amendment Ordinance to add new fees to the 2001-02 Municipal Fee Schedule, amend the Planning Department Table of Organization, to add 1.5 Planner position, and increase non-salary expense in the Planning Department for the individual review process Revision Date: 6/27/2006
361:01 Resolution designating Midpeninsula Community Media Center, Inc. as the Community Access Organization serving the Joint Powers Revision Date: 6/27/2006
364:01 Second Year Performance Review of Palo Alto Sanitation Company (PASCO)/Waste Management Revision Date: 6/27/2006
366:01 Resolution of Intention to assign City's option to acquire the site for the South of Forest Affordable Housing Project to Palo Alto Housing Corporation and Progress Report Revision Date: 6/27/2006
366:01 Resolution of intention to assign City's option to acquire the site for the South of Forest affordable housing project to Palo Alto Housing Corporation and Progress Report Revision Date: 6/27/2006
367:01 Adoption of resolutions authorizing the City Manager to file applications for six separate grants from the State of California for renovation of the Junior Museum & Zoo; Construction of Baylands Nature Center, recreational facilities in SOFA, and Arastradero Preserve Revision Date: 6/27/2006
368:01 Request of Property Owner of Tract 1371 for rezoning from R-1 Single Family Residential to R-1 (S) Single Story Overlay District for a portion of the Garland Neighborhood Revision Date: 6/27/2006
369:01 Approval of the amendment to Chapter 4.39 of the Palo Alto Municipal Code regulating alarms and amendment to the adopted 2001-2002 Municipal Fee Schedule Revision Date: 6/27/2006
371:01 Approval of 3-Year Microsoft Enterprise agreement with ASAP Software in the annual amount of $176,580 Revision Date: 6/27/2006
373:01 Approval of Contract with Accela, Inc. in the amount of $150,000 for Accela Automation™/Velocityhall™ web-based permitting application Revision Date: 6/27/2006
375:01 Approval of amendment no. 3 to contract C9102718 with Ross/Drulis Architects and Planners in the amount of $380,000 for conceptual design of Civic Center expansion alternatives for the Public Safety Building, CIP Project 19820 Revision Date: 6/27/2006
378:01 Approval of increase in the expenditure limit of the Rail Shuttle Bus Service Administration Agreement with the Peninsula Corridor Joint Powers Board for the Palo Alto shuttle project Revision Date: 6/27/2006
379:01 Housing Element of the Comprehensive Plan Revision Date: 6/27/2006
380:01 Approval of change order No. 4 to contract No. C1135134 with Del Conte's Landscaping, Inc. in the amount of $3,730 for installation of a booster pump for PAUSD irrigation project at JLS Middle School Revision Date: 6/27/2006
381:01 Development Impact Fees for Parks, Community Centers & Libraries Revision Date: 6/27/2006
384:01 Approval of scope of services for Main Library/Art Center Conceptual Designs Revision Date: 6/27/2006
385:01 Approval of contracts with Salas O'Brien Engineers; Brown, Vence and Associates; and Encon Energy Conservation Company in the amount of $200,000 for resource efficiency services to utility commercial and industrial customers Revision Date: 6/27/2006
386:01 Approval of change order No. 2 to contract No. C1129753 with Bragato Construction Company in the amount of $28,131 to provide replacement of failed asphalt walkway surfaces of the duck pond parking lots Revision Date: 6/27/2006
387:01 Approval of a resolution to adopt commercial time-of-use electric rates Revision Date: 6/27/2006
388:01 City of Palo Alto's Investment Activity Report for the First Quarter, Fiscal Year 2001-02 Revision Date: 6/27/2006
389:01 Request for approval of 1) the primary objectives for long-term electric portfolio development and 2) the purchase of a 25MW power supply contract for up to five years starting in year 2005 Revision Date: 6/27/2006
400:01 Resolution Declaring Palo Alto to be a Hate-Free zone Revision Date: 6/27/2006
403:01 Consolidated Annual Performance and Evaluation Report (CAPER) for the Community Development Block Grant (CDBG) program for fiscal year 2000/01 Revision Date: 6/27/2006
406:01 Award of contract to Pacific Gas and Electric Company in the amount of $100,000 for training and training consulting services mandated by the United States Department of Transportation for Operator Qualification Compliance Revision Date: 6/27/2006
408:01 Agreement with Santa Clara County Valley Transportation Authority for the Transit Shelter Maintenance and Advertising Program Revision Date: 6/27/2006
409:01 Approval of amendment number one to the Deloitte and Touche contract C9115650 for risk management services to increase the funding in the amount of $215,000 to continue to provide assistance in implementing an energy risk management program for a total maximum compensation for $440,000 Revision Date: 6/27/2006
410:01 Fiber to the Home Trial Update Revision Date: 6/27/2006
411:01 Santa Clara County property tax allocation settlement agreement and release Revision Date: 6/27/2006
412:01 Update on state revenue and tax legislation Revision Date: 6/27/2006
413:01 2425 Embarcadero Way (01-PC-03): Application of Verizon Communications to amend Planned Community (PC) Zoning District PC-3020 to allow telecommunications facilities Revision Date: 6/27/2006
414:01 Approval of amendment number two to the facility lease at 1875 Embarcadero Road to Brad Lozares for operation of a golf retail shop Revision Date: 6/27/2006
416:01 Ground Floor Retail Preservation - Limits on replacement of existing retail uses within office uses and phase-out of nonconforming ground floor offices in Downtown and California Avenue areas Revision Date: 6/27/2006
417:01 Resolution approving a cooperative agreement between the City of Palo Alto and Caltrans for the El Camino Real Caltrans Community-Based Planning Grant Project Revision Date: 6/27/2006
418:01 Watershed Management initiative for the Santa Clara Basin Revision Date: 6/27/2006
420:01 Resolution ratifying the execution of a contract with Sempra Energy Trading Corp Revision Date: 6/27/2006
421:01 Utilities Fiscal Year 2001-03 Demand Side Management and Public Benefits Plan Revision Date: 6/27/2006
422:01 Approval of resolution amending the administrative penalty schedule for operation an alarm system without a permit Revision Date: 6/27/2006
425:01 Request for approval of an ordinance authorizing the City Manager to purchase a portion of the City's energy requirements during the 2005-2010 period under specified terms and conditions and clarification of CMR:389:01 (request for approval of 1) the primary objectives for long-term electric portfolio development and 2) the purchase of a 25MW power supply contract for up to five years starting in year 2005) Revision Date: 6/27/2006
428:01 Property agreements entered into by City Manager under Palo Alto Municipal Code section 2.30.040(c), Fiscal Year 2001-01 Revision Date: 6/27/2006
431:01 Budget Amendment Ordinance accepting Citizens Options for Public Safety (COPS) funds in the amount of $121,598 and approval of a $67,577 transfer to the budget stabilization reserve to reimburse salary expenses in the Police Department Revision Date: 6/27/2006
432:01 Award of contract in the amount of $79,750 to Stone Engineering Contractors Inc. for outfall modifications for the airport storm water pumping station (Capital Improvement Program Project 47715) Revision Date: 6/27/2006
434:01 Approval of amendment to existing contract for employee training with Foothill DeAnza Business and Industry Institute changing contract amount from $85,000 to $119,286 for the second contract year Revision Date: 6/27/2006
435:01 Purchase of the remaining half interest in the former Los Altos Treatment Plant Site at 1275 San Antonio Road for $3,333,500 Revision Date: 6/27/2006
436:01 Approval of contract renewals with Bank of America for banking services and Union Bank for investment security services Revision Date: 6/27/2006
437:01 Approval of the City of Palo Alto's 2001-2002 Disadvantaged Business Enterprise (DBE) program and adoption of a resolution implementing the program Revision Date: 6/27/2006
439:01 Strengthening the Bottom Line Action Plan Revision Date: 6/27/2006
441:01 2nd Reading - Ordinance of the Council of the City of Palo Alto amending sections 18.04.030, 18.41.030, 18.43.030, 18.45.030 and 18.49.050 of the Palo Alto Municipal Code to prohibit the conversion in commercial districts of ground floor non-office uses to medical, professional, administrative and general business offices Revision Date: 6/27/2006
444:01 1) Adoption of attached resolution ordering further cash payments for second series of University Avenue area off-street parking assessment district bonds; and 2) Confirmation to issued taxable certificates of participation to construct non-parking area on Lot S/L; rent space for commercial use and utilize net revenue to fund teen programs; and 3) Approval to use net revenue from non-parking rental space to subsidize Barker Hotel assessment 4) Direct staff to refund and refinance 1992 certificates of participation for Civic Center improvements Revision Date: 6/27/2006
445:01 2000-01 Year-end Capital Improvement Program projects status report Revision Date: 6/27/2006
446:01 Request for Council approval of resolution amending compensation plan for hourly employees by amending salary schedule to add two classifications previously omitted Revision Date: 6/27/2006
447:01 Approval of Amendment No. 1 in the amount of $87,500 to existing professional services contract no. S2140169 with Government Finance Officers Association for services related to the implementation of the Enterprise Resource Planning System Revision Date: 6/27/2006
451:01 Request for approval of agreement between the City of Palo Alto and Midpeninsula Community Media Center, Inc. through June 30, 2002, in the amount of 79,050 Revision Date: 6/27/2006
452:01 Approval of renewal agreement with ChildrenFirst, Inc. in the amount of $53,000 for backup childcare services for City of Palo Alto employees Revision Date: 6/27/2006
455:01 2475 Hanover Street [01-AP-5]: Appeal of the Director of Planning and Community Environment's approval, after review and recommendation by the Architectural Review Board, of an ARB application and a mitigated negative declaration [01-ARB-100, 01-EIA-15] to allow the demolition of an existing one- and two- story building and construction of a two-story building with underground and surface parking facilities Revision Date: 6/27/2006
456:01 Approval of a resolution authorizing the issuance and sale of not to exceed $27,500,000 of Utility revenue bonds, 2002 Series A, to finance water and gas capital improvements; official documents related to bond issuance; and official actions related thereto Revision Date: 6/27/2006
457:01 Approval of budget amendment ordinance in the amount of $288,000 to create Capital Improvment Program project 10223, master schematic design plan for El Camino Real (State Route 82) project and approval of consultant contract with Community Design & Architecture in the amount of $280,262 Revision Date: 6/27/2006
458:01 Approval of a resolution and ordinance to amend the City of Palo Alto's contract with the Public Employees' Retirement System (PERS) to amend Government Section 21362.2,3%@50 Full Formula for the Palo Alto Police Department Safety Members Revision Date: 6/27/2006
459:01 Ordinance closing the 2001-01 fiscal year, including reappropriation requests, completed Capital Improvement Projects, and the year-end performance highlights report Revision Date: 6/27/2006
460:01 Approval of a contract with Del Conte's Landscaping, Inc. in the amount of $345,109 for Robles Park facilities improvement and irrigation renovation Revision Date: 6/27/2006
461:01 250-270 Homer Avenue/819 Ramona Street: Appeal of the Director of Planning and Community Environment's approval, after review and recommendation by the ARB/HRB, of an application by Premier Properties to allow construction of a 37,798-sq.ft., mixed-use project and the rehabilitation of the historic French Laundry building to provide for office and residential uses and related site improvements Revision Date: 6/27/2006
463:01 Approval of financing documents for construction of the non-parking portion of the Lot S/L parking structure, and for the refunding of the 1992 Civic Center certificates of participation, and authorization for staff to execute the sale of an amount not to exceed $9,000,000 in taxable and tax-exempt certificates of participation Revision Date: 6/27/2006
464:01 Construction of a restroom facility at Hoover Park Revision Date: 6/27/2006
465:01 Adoption of revised resolutions authorizing the City Manager to resubmit applications for two separate grants from the State of California for construction of educational exhibits at the Lucy Evans Baylands Nature Center and construction of a gateway facility at the Arastradero Preserve Revision Date: 6/27/2006
466:01 2475 Hanover Street [01-ARB-100, 01-EIA-15]: An Architectural Review Board Application and a mitigated negative declaration [01-ARB-100, 01-EIA-15] to allow the demolition of an existing one- and two- story building and construction of a two-story building with underground and surface parking facilities Revision Date: 6/27/2006
WoodSmokeOrdAmend Ordinance of the Council of the City of Palo Alto amending Chapter 9.06 to Title 9 of the Palo Alto Municipal Code relating to new construction or replacement of wood burning fireplaces and appliances Revision Date: 6/27/2006
313:01 Fund transfer from California Law Enforcement Equipment Program (CLEEP) Revision Date: 8/1/2001
314:01 Approval of an agreement in the amount of $54,400 with the City of Inglewood for parking citation processing Revision Date: 8/1/2001
316:01 Approval of amendment No. 2 in the amount of $557,620 to existing contract No. C8100757 with SCT Utility Systems, Inc. (SCT) for consulting services for utilities customer information system Revision Date: 8/1/2001