City of Palo Alto Homepage
TEXT VERSION 
SEARCH FOR:
Location:
250 Hamilton Avenue
Palo Alto, CA 94301
Telephone:
Phone: 650-329-2161
Fax: 650-329-2154
Hours:
Mon-Thu 7:30-5:30pm
Fri 8-5pm (Closed Alt Fri.)
PV Partners Forms and Downloads
Photovoltaic (PV) Partners Program
Commercial Pre-Submittal Permit Checklist
Checklist for commercial Photovoltaic Permits.
Revision Date: 05/28/2008
Interconnection Agreement & Standards
Photovoltaic/Solar and Wind Electric Generating Facilities. Provide your name, installation address, equipment manufacturer and model number, total system output rating in kilowatts-AC, installation date, and contact phone and fax numbers on the agreement.
Revision Date: 07/18/2007
Net Energy Metering Agreement
Provide your name, installation address, CPAU electric service account number, mailing address, and contact phone and fax numbers on the agreement.
Revision Date: 07/18/2007
Photovoltaic Electric Load Sheet
Photovoltaic Electric Load Sheet
Revision Date: 07/16/2007
PV Inspection Checklist
Photovoltaic Permit Inspection Checklist
Revision Date: 04/25/2008
PV Partner Program Guidebook
PV Partner Program 2008 Guidebook
Revision Date: 07/16/2007
PV Partners Application Less Than 100 kW
Application for PV Partners Rebate (less than 100 kW)
Revision Date: 08/13/2008
PV Partners Performance Based Application
Application for Performance Based Solar Electric Rebate
Revision Date: 08/13/2008
PV Partners Ranks in the Top 10 of Programs Nationwide (2008)
The Solar Electric Power Association (SEPA) has placed the City of Palo Alto's PV Partners' program in the top 10 of programs nationwide for several categories
Revision Date: 07/24/2008
PV Partners Ranks in the Top 10 of Programs Nationwide (2008)
The Solar Electric Power Association (SEPA) has placed the City of Palo Alto's PV Partners' program in the top 10 of programs nationwide for several categories
Revision Date: 07/24/2008
Residential Efficiency Checklist
Checklist for residents prior to installing PV systems.
Revision Date: 08/18/2008
Residential Pre-Submittal Check List
Requirements for residential Photovoltaic Permits.
Revision Date: 07/23/2007
SB1 Report
CPAU SB1 Report for period 7/1/07 to 3/31/08
Revision Date: 05/08/2008
Acceptable Use PolicyAccessibilityYour PrivacySite MapSearch EngineComment FormMissing Content